
Welded cable string is inserted into the trench
The South German Natural Gas Pipeline (SEL) is part of the energy transition. The pipeline will initially supply modern gas-fired power plants in Baden-Württemberg with natural gas and transport hydrogen to Baden-Württemberg over a length of 250 kilometers from the beginning of the 2030s. This will enable the phase-out of coal-fired power generation and, as part of the hydrogen core network, will ensure a CO₂-neutral energy supply in Baden-Württemberg in future. The SEL will be built in several phases as required.
NOTES ON USE
Unless otherwise stated, the rights to the images, texts, audio and video files published on this page are held by FNB Gas e.V. The files from the press material section may be used for editorial reporting provided the source is acknowledged. The use or reprinting is free of charge. Please provide us with a copy in the event of any use. Any other use is only permitted with the prior written consent of FNB Gas e.V.
The files provided have been created to the best of our knowledge and belief. Notwithstanding this, FNB Gas e.V. accepts no responsibility for any damage arising from the use of the files.
Download
Photo: Welded cable string is inserted into the trench (JPG / 633 KB)
Rights Holderterranets bw GmbH