Laying the gas pipes for the Nordschwarzwald pipeline
The Northern Black Forest line of terranets bw runs for just under 70 km from Au am Rhein via Ettlingen and Pforzheim to Leonberg. The first 15-kilometer section from Au am Rhein to Ettlingen was built in 2014. The second, 54-kilometer section between Ettlingen and Leonberg, was completed in 2015/16. The ceremonial commissioning took place on 22.01.2016.
The Nordschwarzwald pipeline will give terranets bw a further connection to the Trans-European Natural Gas Pipeline (TENP). The TENP, which transports natural gas from the Netherlands to Switzerland and Italy, is one of the largest and most important pipelines for secure natural gas supplies in Europe.
NOTES ON USE
Unless otherwise stated, the rights to the images, texts, audio and video files published on this page are held by FNB Gas e.V. The files from the press material section may be used for editorial reporting provided the source is acknowledged. The use or reprinting is free of charge. Please provide us with a copy in the event of any use. Any other use is only permitted with the prior written consent of FNB Gas e.V.
The files provided have been created to the best of our knowledge and belief. Notwithstanding this, FNB Gas e.V. accepts no responsibility for any damage arising from the use of the files.
Download
Print file (high resolution): Laying the gas pipes for the Northern Black Forest pipeline / 16.26MB / JPG / 62.3 × 41.6 cm / 7360 × 4912 px / 300 dpi / RGB
Rights Holderterranets bw GmbH