Press material

Journalists who would like to find out more about FNB Gas, key topics and the background to the association will find selected graphics, photos and films here for downloading and free use. In case of editorial use, we would appreciate a reference to FNB Gas e.V.

Hydrogen Network 2030: Towards a Climate-Neutral Germany

With the Hydrogen Network 2030 (in short: H2 Net 2030), the transmission system operators (TSOs) show solutions how transport needs can be met promptly on a supra-regional basis in the case of dynamic development of the hydrogen market. The 2030 H2 network is about 5,100 km long, of which about 3,700 line kilometers are on converted gas pipelines based. The investment costs up to 2030 amount to around 6 billion euros.

NOTES ON USE
Unless otherwise stated, the rights to the images, texts, audio and video files published on this page are held by FNB Gas e.V. The files from the press material section may be used for editorial reporting provided the source is acknowledged. The use or reprinting is free of charge. Please provide us with a copy in the event of any use. Any other use is only permitted with the prior written consent of FNB Gas e.V.

The files provided have been created to the best of our knowledge and belief. Notwithstanding this, FNB Gas e.V. accepts no responsibility for any damage arising from the use of the files.

Download

Map H2 network 2030 / JPG / 234 kB

Rights Holder

FNB Gas