{"id":6627,"date":"2022-09-01T10:00:00","date_gmt":"2022-09-01T08:00:00","guid":{"rendered":"https:\/\/fnb-gas.de\/hydrogen-network\/h2-report\/"},"modified":"2026-01-05T16:33:33","modified_gmt":"2026-01-05T15:33:33","slug":"recap","status":"publish","type":"page","link":"https:\/\/fnb-gas.de\/en\/hydrogen-transport\/recap\/","title":{"rendered":"Recap: From vision to mission"},"content":{"rendered":"\n<div style=\"height:27px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>Since January 2020, the TSOs have been actively working on the development of the German hydrogen network. Many of the earlier considerations and experiences have been incorporated into the planning and design of the hydrogen core network. The most important milestones to date at a glance:  <\/p>\n\n\n\n<div class=\"wp-block-getwid-accordion has-icon-left\" data-active-element=\"none\">\n<div class=\"wp-block-getwid-accordion__header-wrapper\"><span class=\"wp-block-getwid-accordion__header\"><a href=\"#\"><span class=\"wp-block-getwid-accordion__header-title\"><strong>Joint application of the TSOs for the hydrogen core network<\/strong><\/span><span class=\"wp-block-getwid-accordion__icon is-active\"><i class=\"fas fa-plus\"><\/i><\/span><span class=\"wp-block-getwid-accordion__icon is-passive\"><i class=\"fas fa-minus\"><\/i><\/span><\/a><\/span><\/div><div class=\"wp-block-getwid-accordion__content-wrapper\"><div class=\"wp-block-getwid-accordion__content\">\n<p>FNB Gas e.V. submitted the joint application of the transmission system operators for the hydrogen core network to the Federal Network Agency on 22.07.2024. This represents a key milestone in the realization of the core network.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"856\" height=\"1024\" src=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/07\/20240624_Kernnetz_2032_gru\u0308n-856x1024.png\" alt=\"\" class=\"wp-image-12783\" srcset=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/07\/20240624_Kernnetz_2032_gru\u0308n-856x1024.png 856w, https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/07\/20240624_Kernnetz_2032_gru\u0308n-251x300.png 251w, https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/07\/20240624_Kernnetz_2032_gru\u0308n-768x919.png 768w, https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/07\/20240624_Kernnetz_2032_gru\u0308n-1284x1536.png 1284w, https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/07\/20240624_Kernnetz_2032_gru\u0308n-1712x2048.png 1712w\" sizes=\"auto, (max-width: 856px) 100vw, 856px\" \/><\/figure>\n\n\n\n<p><strong>Key data of the hydrogen core network according to the application of 22.07.2024<\/strong><\/p>\n\n\n\n<p>The total length of the optimized core grid according to the application is 9,666 km.  Of this, 802 km is accounted for by pipelines from 16 other potential hydrogen network operators (distribution network operators). The core network consists mainly of converted natural gas pipelines (approx. 60%). The investment costs amount to \u20ac 19.7 billion. The feed-in and feed-out capacities amount to around 100 GW and 87 GW respectively.<\/p>\n\n\n\n<p>The core grid meets the targets set out in the EnWG for a nationwide, expandable, efficient, climate-friendly and rapidly realizable hydrogen grid by the target year 2032. In order to create more flexibility in the implementation of the projects, the EnWG also provides for the possibility of extending the timing of individual approved core grid measures if certain measures only prove necessary at a later date up to 2037. <\/p>\n\n\n\n<p>The core network puts Germany at the forefront of infrastructure development in Europe. It is the starting signal and the basis for the development of the hydrogen market. The TSOs are thus making an advance payment: the core network is the offer to the market, it comes for the market and continues to develop with it.  <\/p>\n\n\n\n<div class=\"fnb-zitat-block\">\n    <div class=\"fnb-zitat-wrap  stil-quotes\">\n        <span class=\"zitat-line\"><\/span>\n        <div class=\"fnb-zitat\"><span>With the core network, we are creating a central prerequisite for the successful hydrogen ramp-up in Germany and thus for the decarbonization of industry and energy supply. It gives market participants the security they need to invest in the hydrogen economy and the transformation to climate neutrality. The hydrogen ramp-up is now a joint task for all market participants.  <\/span><\/div>\n                                    <div class=\"fnb-zitat-autor\">Dr. Thomas G\u00f6\u00dfmann, Chairman of the Board FNB Gas<\/div>\n                 <span class=\"zitat-line\"><\/span>\n        <\/div>\n\n    <\/div>\n\n\n<p><strong>What are the next steps?<\/strong><\/p>\n\n\n\n<p>The BNetzA has carried out a further two-week consultation until 06.08.2024. The core network is approved by the BNetzA no later than two months after submission of the application documents. After approval, the TSOs begin to build the core network. The first lines are to be converted to hydrogen as early as next year.<\/p>\n\n\n\n<p><strong>Outlook: What still needs to be done?<\/strong><\/p>\n\n\n\n<p>The BNetzA will set the ramp-up fee in the second half of 2024.<\/p>\n\n\n\n<p>In addition, the contractual arrangements for the provision and financing of the amortization account for the construction of a hydrogen core network still have to be drawn up.<\/p>\n\n\n\n<p>Regulations also still need to be developed with regard to a market model for hydrogen, including the marketing of transport capacities. In addition, future market roles such as storage, particularly in the market ramp-up phase, have not yet been clarified. <\/p>\n\n\n\n<p>In order for the market ramp-up to succeed overall, it is important that policymakers create reliable framework conditions for the hydrogen ramp-up on the generation and demand side. Another focus is on the further development of the core network in order to take additional requirements and locations into account as part of integrated network development planning for gas and hydrogen (stage 2). The transformation of the distribution grids is also important for this in order to develop an area-wide hydrogen grid.  <\/p>\n\n\n\n<div class=\"container-fluid fnb-downloadl-block break-out\">\n    <div class=\"container\">\n\n        <div class=\"row\">\n            <div class=\"col-xs-12\">\n                <h4 class=\"rubrik text-center\">Downloads<\/h4>\n            <\/div>\n\n            <!-- Downloads -->\n            \n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Application for hydrogen core network (DE)<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 4 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/07\/2024_07_22_Antrag_Wasserstoff-Kernnetz_final.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Application for hydrogen core network (EN)<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 5 MB  <\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/07\/2024_07_22-Joint-Appllication-Core-Network_Translation.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Annex 1 &#8211; Project overview hydrogen core network<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">XLSX \/ 201 kB  <\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/07\/2024_07_22_Anlage1_Projektu\u0308bersicht_Wasserstoff-Kernnetz.xlsx\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Annex 2 &#8211; Line reports from other potential hydrogen network operators<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">XLSX \/ 72 kB  <\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/07\/2024_07_22_Anlage2_Leitungsmeldungen_weiterer_potenzieller_Wasserstoffnetzbetreiber.xlsx\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Annex 3 &#8211; List of measures for new construction of the FNB<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">XLSX \/ 73 kB  <\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/07\/2024_07_22_Anlage3_FNB_Massnahmenliste_Neubau.xlsx\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Annex 4 &#8211; List of measures for the conversion of the FNB<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">XLSX \/ 87 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/07\/2024_07_22_Anlage4_FNB_Massnahmenliste_Umstellung.xlsx\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Annex 5 &#8211; List of natural gas enhancing measures of the TSOs<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">XLSX \/ 66 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/07\/2024_07_22_Anlage5_FNB_Massnahmenliste_erdgasversta\u0308rkende-Massnahmen.xlsx\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Annex 6 &#8211; Detailed map of measures <\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 2 MB <\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/07\/2024_07_22_Anlage6_Karte_Wasserstoff-Kernnetz.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Annex 6 &#8211; Detailed map of measures (supplement diff. new building conversion)<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 2 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/08\/Anlage-6-Ergaenzung_Diff.Neubau_Umstellung-1.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Press release core network application<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 259 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/07\/2024-07-23_FNB-Gas_Pressemitteilung-Kernnetzantrag-2.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Contact for FNB core network measures<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">XLSX \/ 70 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/07\/2024_07_22_FNB-Ansprechpartner-fu\u0308r-Kernnetzmassnahmen.xlsx\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Hydrogen core network map<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PNG \/ 2 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/07\/20240624_Kernnetz_2032_gru\u0308n-1.png\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Hydrogen core network map  <\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 419 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/07\/20240723_Kernnetz_gru\u0308n.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                        <!-- \/Downloads -->\n\n        <\/div>\n\n    <\/div>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-getwid-accordion__header-wrapper\"><span class=\"wp-block-getwid-accordion__header\"><a href=\"#\"><span class=\"wp-block-getwid-accordion__header-title\"><strong>Draft application for the hydrogen core network<\/strong><\/span><span class=\"wp-block-getwid-accordion__icon is-active\"><i class=\"fas fa-plus\"><\/i><\/span><span class=\"wp-block-getwid-accordion__icon is-passive\"><i class=\"fas fa-minus\"><\/i><\/span><\/a><\/span><\/div><div class=\"wp-block-getwid-accordion__content-wrapper\"><div class=\"wp-block-getwid-accordion__content\">\n<p>On November 15, 2023, FNB Gas e.V. submitted the draft application for the hydrogen core network to the Federal Network Agency and the Federal Ministry of Economics and Climate Protection. This marks the next milestone in the realization of the core network.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Key data of the hydrogen core network design<\/h4>\n\n\n\n<p>The total length of the optimized core grid is around 9,700 km . Of this, 710 km is accounted for by pipelines from 17 other potential hydrogen network operators, which the TSOs received as part of the opportunity to comment on the first planning status by 28.7.2023. The core network consists mainly of converted natural gas pipelines (approx. 60%). The investment costs amount to \u20ac 19.8 billion \u20ac. The feed-in and feed-out capacities amount to around 100 GW and 87 GW respectively. The draft of the core grid thus fulfills the goals of a Germany-wide, expandable, efficient and quickly realizable hydrogen grid by the target year 2032, as set out in the EnWG amendment on the hydrogen core grid. This puts Germany at the forefront of infrastructure development in Europe.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">What are the next steps?<\/h4>\n\n\n\n<p>The Federal Network Agency consulted the FNB&#8217;s draft application via its <a href=\"https:\/\/eur01.safelinks.protection.outlook.com\/?url=https%3A%2F%2Fwww.bundesnetzagentur.de%2FDE%2FFachthemen%2FElektrizitaetundGas%2FWasserstoff%2FKernnetz%2Fstart.html&amp;data=05%7C02%7CMehtap.Corallo%40fnb-gas.de%7Cb85b2156ea8844f5d40a08dc78bc2d3a%7C4c2096ab616c4e77896bcd225c123ac4%7C0%7C0%7C638517996807821740%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&amp;sdata=9RzED%2F2dHiWik2LoRXj1Yuodu%2FxJNVLzysEupSkxo20%3D&amp;reserved=0\" target=\"_blank\" rel=\"noreferrer noopener\">website<\/a> until January 8, 2024 and then evaluated and reviewed the results of the consultation. The TSOs will take the results into account in their final joint application for the core grid in consultation with the BNetzA.<\/p>\n\n\n\n<p>The submission deadline for the joint application for the core network was set by the BNetzA in accordance with Art. \u00a7 Section 28q para. 2 sentence 2 EnWG initially refers to the May 21, 2024 extended. However, the EnWG stipulates that, insofar as the energy supply 10 and \u00a7 28s para. 6 EnWG has not been granted at the latest one week before the expiry of the extended application deadline, the BNetzA will extend the application deadline by a further month in each case. As this state aid approval from Brussels was not available by the deadline of May 14, 2024, the BNetzA initially postponed the deadline to May 14, 2024. June 21, 2024 and subsequently to the July 22, 2024 postponed.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Development of the hydrogen core network<\/h4>\n\n\n\n<p>The hydrogen core network will be built up successively until 2032, starting with the first pipeline conversion in 2025. The planned commissioning of the annual expansion stages of the core network in the years up to 2032 can be seen in the following diagram.<\/p>\n\n\n\n<figure class=\"wp-block-video\"><video controls src=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/03\/Jahreskarten20252032Web.mp4\"><\/video><\/figure>\n\n\n\n<div class=\"container-fluid fnb-downloadl-block break-out\">\n    <div class=\"container\">\n\n        <div class=\"row\">\n            <div class=\"col-xs-12\">\n                <h4 class=\"rubrik text-center\">Downloads<\/h4>\n            <\/div>\n\n            <!-- Downloads -->\n            \n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Draft application H2 core network in German<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 995 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/11\/2023_11_15_Entwurf_Antrag_Wasserstoff-Kernnetz_final.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Draft application H2 core network (EN)<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 2 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/03\/FNB-Gas-Entwurf-Antrag-Wasserstoff-Kernnetz_en.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Draft application H2 core network Press release<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 615 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/11\/2023-11-15_FNB-Gas_Pressemitteilung_Veroeffentlichung-Antragsentwurf-H2-Kernnetz_final-3.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Draft H2 core network map<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PNG \/ 1 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/11\/20231117_Entwurf_Kernnetzgruen.png\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Draft H2 core network map with logo<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PNG \/ 2 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/11\/2023-11-14_Wasserstoff-Kernnetz_Karte-1.png\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Appendix 1 Project overview<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">Excel \/ 178 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/11\/2023_11_15_Anlage1_Projektuebersicht_Wasserstoff-Kernnetz_Veroeffentlichung_final.xlsx\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Appendix 2 List of measures for other H2 grid operators<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">Excel \/ 55 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/11\/2023_11_15_Anlage2_Leitungsmeldungen_weiterer_potenzieller_Wasserstoffnetzbetreiber_Veroeffentlichung_final.xlsx\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Appendix 3 List of measures FNB<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">Excel \/ 132 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/11\/2023_11_15_Anlage3_FNB_Massnahmenliste_Veroeffentlichung_final.xlsx\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Appendix 4 Detailed map of measures<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 2 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/11\/2023_11_15_Anlage4_Detail-Massnahmenkarte.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                        <!-- \/Downloads -->\n\n        <\/div>\n\n    <\/div>\n<\/div>\n\n\n<p><\/p>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-getwid-accordion__header-wrapper\"><span class=\"wp-block-getwid-accordion__header\"><a href=\"#\"><span class=\"wp-block-getwid-accordion__header-title\"><strong>Planning status of the hydrogen core network<\/strong><\/span><span class=\"wp-block-getwid-accordion__icon is-active\"><i class=\"fas fa-plus\"><\/i><\/span><span class=\"wp-block-getwid-accordion__icon is-passive\"><i class=\"fas fa-minus\"><\/i><\/span><\/a><\/span><\/div><div class=\"wp-block-getwid-accordion__content-wrapper\"><div class=\"wp-block-getwid-accordion__content\">\n<p><em>July 2023<\/em><\/p>\n\n\n\n<p>On July 12, 2023, the transmission system operators published the planning status for a supraregional hydrogen core network by 2032. This planning status does not yet correspond to the final draft of the hydrogen core network. The route variants presented will be evaluated and optimized in subsequent steps, taking into account reports received as part of the &#8220;opportunity to comment&#8221; from potential hydrogen network operators. The pipelines shown have a length of around 11,200 km. The TSOs expect the hydrogen core network to be smaller after optimization.<\/p>\n\n\n\n<p>A total of 309 hydrogen projects were considered in the hydrogen core network scenario. The feed-in capacities for hydrogen total 101 GW. Other feeds include, in particular, imports via ship terminals where hydrogen transported in another form, such as LOHC or ammonia, is fed into the hydrogen grid as a gas. The core grid can provide 87 GW of exit power for hydrogen supply.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Opportunity for network operators to comment by July 28<\/strong><\/h3>\n\n\n\n<p>Based on the published planning status for the hydrogen core network, operators of distribution networks, hydrogen network operators and operators of other pipeline infrastructures pursuant to \u00a7 28r para. 5 EnWG until July 28 to comment on and report further hydrogen infrastructures for the hydrogen core network. For the feedback to <a href=\"mailto:info@fnb-gas.de\" target=\"_blank\" rel=\"noreferrer noopener\">info@fnb-gas.de<\/a>, the TSOs have provided a corresponding <a href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/07\/2023-07-12_Template_Leitungsnetzinfrastruktur-1.xlsx\">form on<\/a> the website of the TSO Gas. Subsequently, the reported pipeline infrastructures are checked for their use in the planning of the hydrogen core network by the transmission system operators and taken into account in the final modeling, provided that they meet the legal and technical requirements for integration into the hydrogen core network and the infrastructure is necessary for the transport requirements.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Opportunity for other stakeholders to comment to BMWK by July 28.<\/strong><\/h3>\n\n\n\n<p>The amendment to the EnWG provides for the central hydrogen sources (generation and import) to be connected to the main consumption centers and hydrogen storage facilities via a Germany-wide hydrogen core network. As a basis for this, a scenario was developed under the leadership of the BMWK and the BNetzA and coordinated with the TSOs, within the framework of which the modeling of the hydrogen core network takes place. Based on the current planning status, the German Federal Ministry of Economics and Climate Protection is also giving states, associations and other stakeholders until July 28 to comment on the development of a Germany-wide, efficient, quickly realizable and expandable hydrogen core network. This gives stakeholders &#8211; where necessary and in line with Section 28r (4) EnWG-E and the scenario &#8211; the opportunity to present arguments for the inclusion of further pipeline infrastructures in the hydrogen core network. Comments may be submitted to the following BMWK email address: <a href=\"mailto:WASSERSTOFFKERNNETZ@bmwk.bund.de\">WASSERSTOFFKERNNETZ@bmwk.bund.de<\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Core network as starting point for future integrated hydrogen network planning<\/strong><\/h3>\n\n\n\n<p>The hydrogen core network is the starting signal for the hydrogen ramp-up. It will cover the needs according to the criteria defined by law. Any additional requirements should be taken into account promptly in a second step as part of the future regulatory process for integrated network development planning for gas and hydrogen. The TSOs had already submitted corresponding proposals in this regard in September 2022 with the publication of the <a href=\"https:\/\/fnb-gas.de\/wasserstoffnetz\/h2-bericht\/\" target=\"_blank\" rel=\"noreferrer noopener\">hydrogen report<\/a> in accordance with Section 28p of the Energy Industry Act (EnWG), which were drawn up jointly with the distribution system operators, among others.  <\/p>\n\n\n\n<h3 class=\"wp-block-heading\">More information<\/h3>\n\n\n\n<p>In an <a href=\"https:\/\/eur01.safelinks.protection.outlook.com\/?url=https%3A%2F%2Fwww.bmwk.de%2FRedaktion%2FDE%2FFAQ%2FWassertstoff-Kernnetz%2Ffaq-wasserstoff-kernnetz.html&amp;data=05%7C01%7Celvin.eyubov%40fnb-gas.de%7C3f7edfc3c8864d4515e008db836ed7a7%7C4c2096ab616c4e77896bcd225c123ac4%7C0%7C0%7C638248284299422277%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&amp;sdata=FQxrl2pLtEymFW4hd5WPVeqC4%2B1RHOc0bq9sy7JSGd8%3D&amp;reserved=0\" target=\"_blank\" rel=\"noreferrer noopener\">official FAQ<\/a>, the BMWK has already addressed and answered initial questions about the core network. To answer your questions, FNB invite industry representatives from companies and associations to a virtual hydrogen lunch at Microsoft Teams on July 14, 2023 at 12:00 pm. Please log on to <a href=\"mailto:info@fnb-gas.de\" target=\"_blank\" rel=\"noreferrer noopener\">info@fnb-gas.de<\/a>. You will then be sent the dial-up data.<\/p>\n\n\n\n<p>The hydrogen core network as the first expansion stage forms the basic framework of the future hydrogen infrastructure. Following this, the processes for integrated gas network planning (hydrogen and natural gas) must now be anchored in law as quickly as possible so that future requirements for hydrogen can be incorporated into further network planning. As part of the interim report pursuant to Section 112b (1) sentence 2 EnWG<a href=\"https:\/\/eur01.safelinks.protection.outlook.com\/?url=https%3A%2F%2Fdserver.bundestag.de%2Fbtd%2F20%2F079%2F2007915.pdf&amp;data=05%7C01%7Celvin.eyubov%40fnb-gas.de%7C5970b3d435ad4894bb4908db9e6a86a0%7C4c2096ab616c4e77896bcd225c123ac4%7C0%7C0%7C638277952573301199%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&amp;sdata=761Jf4U5IS9rdqUjV7TwF%2BpAvuV2U4%2FLx3l6RDYCrOQ%3D&amp;reserved=0\" target=\"_blank\" rel=\"noreferrer noopener\">(BT-Drucksache 20\/7915<\/a>) of July 27, the German government outlined initial proposals for a concept for the further development of the hydrogen network infrastructure.<\/p>\n\n\n\n<p><a href=\"https:\/\/fnb-gas.de\/en\/news\/departure-into-the-hydrogen-economy-fnb-presents-current-planning-status-for-the-hydrogen-core-network-as-first-step-for-the-future-hydrogen-network\/\" target=\"_blank\" rel=\"noreferrer noopener\">Learn more<\/a><\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"566\" height=\"827\" src=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/07\/2023-07-12_Karte-Planungsstand-H2-Kernnetz.png\" alt=\"\" class=\"wp-image-10237\" srcset=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/07\/2023-07-12_Karte-Planungsstand-H2-Kernnetz.png 566w, https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/07\/2023-07-12_Karte-Planungsstand-H2-Kernnetz-205x300.png 205w\" sizes=\"auto, (max-width: 566px) 100vw, 566px\" \/><\/figure><\/div>\n\n\n<div class=\"container-fluid fnb-downloadl-block break-out\">\n    <div class=\"container\">\n\n        <div class=\"row\">\n            <div class=\"col-xs-12\">\n                <h4 class=\"rubrik text-center\">Downloads<\/h4>\n            <\/div>\n\n            <!-- Downloads -->\n            \n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Planning status H2 core network<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 2 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/07\/2023-07-12_FNB-Gas_Planungsstand-Wasserstoff-Kernnetz.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Planning status H2 core network Press release<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 773 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/07\/2023-07-12_FNB-Gas_Planungsstand-H2-Kernnetz_PI-2.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Planning status H2 core network Map<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PNG \/ 1 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/07\/2023-07-12_FNB-Gas_Planungsstand-H2-Kernnetz_Karte.png\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Pipeline network infrastructure notification form<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">Excel \/ 41 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/07\/2023-07-12_Template_Leitungsnetzinfrastruktur-1.xlsx\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                        <!-- \/Downloads -->\n\n        <\/div>\n\n    <\/div>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-getwid-accordion__header-wrapper\"><span class=\"wp-block-getwid-accordion__header\"><a href=\"#\"><span class=\"wp-block-getwid-accordion__header-title\"><strong>Hydrogen report<\/strong><\/span><span class=\"wp-block-getwid-accordion__icon is-active\"><i class=\"fas fa-plus\"><\/i><\/span><span class=\"wp-block-getwid-accordion__icon is-passive\"><i class=\"fas fa-minus\"><\/i><\/span><\/a><\/span><\/div><div class=\"wp-block-getwid-accordion__content-wrapper\"><div class=\"wp-block-getwid-accordion__content\">\n<p><em>September 2022<\/em><\/p>\n\n\n\n<p>The hydrogen report submitted on September 1, 2022 by the transmission system operators in accordance with the Energy Industry Act shows how the transport infrastructure can be developed efficiently, quickly and in a targeted manner by integrating hydrogen network planning into the proven gas network planning.<strong> <\/strong> <\/p>\n\n\n\n<p>The transmission system operators provide the Federal Network Agency and the legislature with <a href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/08\/2022-09-01_FNB-Gas_Wasserstoffbericht_Empfehlungen-an-BNetzA-und-Gesetzgeber.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">twelve recommendations<\/a> that should be implemented this year. Only then can grid operators start building hydrogen grids and converting lines.<\/p>\n\n\n\n<p>The focus of the recommendations was on:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>the introduction of a mandatory and integrated network planning process gas (hydrogen and methane) according to best practice<\/li>\n\n\n\n<li>the introduction of a consistent, uniform and mandatory regulatory framework for all operators of a public supply hydrogen network<\/li>\n\n\n\n<li>the creation of a framework that enables the refinancing of network investments and economically viable network charges, especially in the market ramp-up phase<\/li>\n\n\n\n<li>the creation of legal requirements for the conversion of network areas of TSOs and DSOs as well as for the consideration of the conversion areas in the network development planning gas<\/li>\n<\/ul>\n\n\n\n<p>Note: The hydrogen report was a one-off report. The reporting obligation was abolished by law in 2024. Since then, the majority of our recommendations have been implemented or are currently under discussion.  <\/p>\n\n\n\n<p>The Coordination Office for Integrated Gas and Hydrogen Network Development Planning (KO.NEP) was created on 30.05.2024 for integrated gas and hydrogen network development planning.<\/p>\n\n\n\n<p><strong>Video message from FNB Gas CEO Dr. Thomas G\u00f6\u00dfmann on the publication of the hydrogen report<\/strong>:<\/p>\n\n\n\n<figure class=\"wp-block-video\"><video controls src=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/08\/FNB-Full-Cut-1-Smaller.mov\"><\/video><\/figure>\n\n\n\n<div class=\"container-fluid fnb-downloadl-block break-out\">\n    <div class=\"container\">\n\n        <div class=\"row\">\n            <div class=\"col-xs-12\">\n                <h4 class=\"rubrik text-center\">Downloads<\/h4>\n            <\/div>\n\n            <!-- Downloads -->\n            \n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Hydrogen Report<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 3 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/08\/2022-09-01_FNB-Gas_Wasserstoffbericht.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Hydrogen Report Recommendations<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 41 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/08\/2022-09-01_FNB-Gas_Wasserstoffbericht_Empfehlungen-an-BNetzA-und-Gesetzgeber.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Hydrogen Report Press Release<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 108 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/09\/2022-09-01_FNB-Gas_Wasserstoffbericht_Pressemitteilung-1.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Hydrogen report call collaboration creation<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 132 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/09\/Aufruf-zur-Mitarbeit-fuer-die-erstmalige-Erstellung-des-H2-Berichts-nach-\u00a7-28q-EnWG.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Hydrogen Report and GTP Webinar 10\/25\/2022<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 2 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/10\/2022-10-25_Informationsveranstaltung_Wasserstoffbericht_GTP.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                        <!-- \/Downloads -->\n\n        <\/div>\n\n    <\/div>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-getwid-accordion__header-wrapper\"><span class=\"wp-block-getwid-accordion__header\"><a href=\"#\"><span class=\"wp-block-getwid-accordion__header-title\"><strong>Hydrogen network 2032 in the Gas NDP 2022-2032<\/strong><\/span><span class=\"wp-block-getwid-accordion__icon is-active\"><i class=\"fas fa-plus\"><\/i><\/span><span class=\"wp-block-getwid-accordion__icon is-passive\"><i class=\"fas fa-minus\"><\/i><\/span><\/a><\/span><\/div><div class=\"wp-block-getwid-accordion__content-wrapper\"><div class=\"wp-block-getwid-accordion__content\">\n<p><em>July 2022<\/em><\/p>\n\n\n\n<p>The hydrogen network 2032 presented in the interim status for the NEP Gas 2022-2032 shows the result of the modeling of a Germany-wide hydrogen network for the year 2032 based on the Memorandum of Understanding (MoU) requirements, the results of the NEP Gas 2020-2030 and the pipeline reports of the transmission system operators and other potential hydrogen network operators as well as on existing parallel pipeline systems in the transmission system.<\/p>\n\n\n\n<p>Transmission system operators were able to conclude letters of intent with more than 250 project sponsors for a transport demand of 165 TWh, of which about 90% can be connected to the hydrogen grid in 2032. The modeling results in a hydrogen network with a pipeline length of 7,600-8,500 km by 2032.<\/p>\n\n\n\n<p><a href=\"https:\/\/fnb-gas.de\/en\/news\/special-times-require-special-measures\/\" target=\"_blank\" rel=\"noreferrer noopener\">Learn more<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"882\" height=\"1024\" src=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/07\/H2-Pipes-2032-nur-gruen-882x1024.png\" alt=\"\" class=\"wp-image-7932\" srcset=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/07\/H2-Pipes-2032-nur-gruen-882x1024.png 882w, https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/07\/H2-Pipes-2032-nur-gruen-259x300.png 259w, https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/07\/H2-Pipes-2032-nur-gruen-768x891.png 768w, https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/07\/H2-Pipes-2032-nur-gruen-1324x1536.png 1324w, https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/07\/H2-Pipes-2032-nur-gruen-1765x2048.png 1765w\" sizes=\"auto, (max-width: 882px) 100vw, 882px\" \/><\/figure>\n\n\n\n<div class=\"container-fluid fnb-downloadl-block break-out\">\n    <div class=\"container\">\n\n        <div class=\"row\">\n            <div class=\"col-xs-12\">\n                <h4 class=\"rubrik text-center\">Downloads<\/h4>\n            <\/div>\n\n            <!-- Downloads -->\n            \n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>NDP Gas 2022-2032 Interim status<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 16 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/07\/2022_07_06_NEP-Gas-2022-2032-Zwischenstand.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>NDP Gas 2022-2032 Interim Status Annex 2<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">Excel \/ 679 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/07\/2022_07_06_Zwischenstand-NEP-2022_Anlage-2_Projektmeldungen-WEB.xlsx\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>NDP Gas 2022-2032 Interim Status Annex 3<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">Excel \/ 78 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/07\/2022_07_06_Zwischenstand-NEP-2022_Anlage-3_Ergebnisliste_Leitungsnetzinfrastruktur.xlsx\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>NDP Gas 2022-2032 Interim Status Annex 4<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 23 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/07\/2022_07_06_Zwischenstand-NEP-2022_Anlage-4_Uebersichtskarten-Leitungsnetzinfrast.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Summary NDP Gas 2022-2032 Interim Status<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 377 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/07\/2022_07_06_Zusammenfassung_NEP-Gas-2022-2032-Zwischenstand.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Press Release Publication NEP Gas 2022-2032 Interim Status<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 225 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/07\/2022_07_06_FNB-Gas-PI-Veroeffentlichung-Zwischenstand-NEP-2032.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                        <!-- \/Downloads -->\n\n        <\/div>\n\n    <\/div>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-getwid-accordion__header-wrapper\"><span class=\"wp-block-getwid-accordion__header\"><a href=\"#\"><span class=\"wp-block-getwid-accordion__header-title\"><strong>Hydrogen grid 2050: For a climate-neutral Germany<\/strong><\/span><span class=\"wp-block-getwid-accordion__icon is-active\"><i class=\"fas fa-plus\"><\/i><\/span><span class=\"wp-block-getwid-accordion__icon is-passive\"><i class=\"fas fa-minus\"><\/i><\/span><\/a><\/span><\/div><div class=\"wp-block-getwid-accordion__content-wrapper\"><div class=\"wp-block-getwid-accordion__content\">\n<p><em>December 2021<\/em><\/p>\n\n\n\n<p>At the same time as the H2 Grid 2030, the FNB publishes the hydrogen grid for a climate-neutral Germany (in short: H2 Grid 2050), and shows that they can construct such a grid in an economically efficient and reliable manner at moderate investment costs. The H2 network 2050 has been further developed by the TSOs from the &#8220;Visionary Hydrogen Network&#8221; published in January 2020. For the first time, the H2 grid 2050 is based on detailed grid planning.<\/p>\n\n\n\n<p>The 2050 H2 network is about 13,300 km long, of which more than 80 percent is based on converted gas pipelines. It can provide an energy quantity of 504 TWh (calorific value), with a peak offtake of around 110 GWh\/h of hydrogen.<\/p>\n\n\n\n<p><a href=\"https:\/\/fnb-gas.de\/en\/news\/hydrogen-network-2050-for-a-climate-neutral-germany\/\" target=\"_blank\" rel=\"noreferrer noopener\">Learn more<\/a><\/p>\n\n\n<div class=\"h2netz break-out container-fluid\"><h3 class=\"map-headline subheadline\">Leitungsumstellung und -neubau<\/h3><div class=\"map-wrap-outer\"><div class=\"map-wrap\"><div class=\"layer waerme-map map-single-layer\"><\/div><div class=\"layer verkehr-map map-single-layer\"><\/div><div class=\"layer ptg-map map-single-layer\"><\/div><div class=\"layer h2netz-map\"><\/div><div class=\"layer cities-map\"><\/div><div class=\"layer kspeicher-map\"><\/div><div class=\"layer raffinerien-map\"><\/div><div class=\"layer chemie-map\"><\/div><div class=\"layer stahl-map\"><\/div><div class=\"layer importe-map map-single-layer\"><\/div><img decoding=\"async\" src=\"https:\/\/fnb-gas.de\/wp-content\/themes\/b5st-child\/images\/h2map\/map_germany.svg\"><\/div><div class=\"map-legend\"><div class=\"map-main-header\">Interaktive Karte \u2013<br><span>Zum Aktivieren eines Sektors bitte auf das jeweilige Symbol klicken<\/span><\/div><ul><li class=\"h2netz\"><div>Umstellung<br>Neubau<\/div><\/li><\/ul><div class=\"map-legend-header\">Verbrauchsschwerpunkte<\/div><ul><li class=\"raffinerien\" data-layer=\"raffinerien-map\" data-headline=\"hl_industrie\"><div>Raffinerien<\/div><span>Verbrauch: 3,6 TWh<\/span><\/li><li class=\"stahl\" data-layer=\"stahl-map\" data-headline=\"hl_industrie\"><div>Stahlindustrie<\/div><span>Verbrauch: 93,2 TWh<\/span><\/li><li class=\"chemie\" data-layer=\"chemie-map\" data-headline=\"hl_industrie\"><div>Chemie<\/div><span>Verbrauch: 243,4 TWh<\/span><\/li><li class=\"verkehr map-single\" data-layer=\"verkehr-map\"  data-headline=\"hl_verkehr\"><div>Verkehr<br><br>Autobahnen<\/div><span>Verbrauch: 89,4 TWh<\/span><\/li><li class=\"waerme map-single\" data-layer=\"waerme-map\"  data-headline=\"hl_waerme\"><div>W\u00e4rme<\/div><span>58 TWh (Fernw\u00e4rme, H2-Beimischung, Umstellung)<\/span><\/li><\/ul><div class=\"map-legend-header\"><div>Einspeiseschwerpunkte<\/div><span><\/span><\/div><ul><li class=\"ptg map-single\" data-layer=\"ptg-map\" data-headline=\"hl_ptg\"><div>Power-to-Gas<br>(Erzeugung)<\/div><span>Jahresmengen: 164 TWh<br>Inst. Leistung: 63 GW<sub>el<\/sub><\/span><\/li><li class=\"kspeicher\" data-layer=\"kspeicher-map\" data-headline=\"hl_kavernenspeicher\"><div>Kavernenspeicher<\/div><span>Ausspeicherleistung: 69 GW <br>Einspeicherleistung: 23 GW<br>Arbeitsvolumen:<br> 10,6 Mrd. Nm<sup>3<\/sup> (= 32 TWh)<\/span><\/li><li class=\"importe map-single\" data-layer=\"importe-map\" data-headline=\"hl_importe\"><div>Importe<\/div><\/li><\/ul><div class=\"map-disclaimer\">Bei den Karten handelt es sich um eine schematische Darstellung von Leitungstrassen, in denen auch mehrere Leitungen parallel verlaufen k\u00f6nnen. Leitungstrassen, in denen sowohl umgestellte Leitungen als auch Neubauleitungen parallel verlaufen, werden als Umstellungen dargestellt. Alle Werte in Heizwert (Hi) dargestellt.<\/div><\/div><\/div><div class=\"map-wrap-outer-mobile\"><div class=\"mob-leitung\"><div class=\"mobile-map-info\"><b>Leitungsumstellung und -neubau<\/b><span class=\"mob-leitung-description\">Umstellung<br>Neubau<\/span><\/div><img decoding=\"async\" alt=\"Leitungsumstellung und -neubau\" src=\"https:\/\/fnb-gas.de\/wp-content\/themes\/b5st-child\/images\/h2map\/map-mobile\/mob-Leitungsumstellung.svg\"><\/div><div class=\"map-mob-legend-header\"><h5>Verbrauchsschwerpunkte<\/h5><\/div><div><div class=\"mobile-map-info\"><b>Raffinerien<\/b><br> Verbrauch:  3,6 TWh<\/div><img decoding=\"async\" alt=\"Bedarf Industrie\" src=\"https:\/\/fnb-gas.de\/wp-content\/themes\/b5st-child\/images\/h2map\/map-mobile\/mob-raffinerien.svg\"><\/div><div><div class=\"mobile-map-info\"><b>Stahlindustrie<\/b><br> Verbrauch: 93,2 TWh<\/div><img decoding=\"async\" alt=\"Bedarf Industrie\" src=\"https:\/\/fnb-gas.de\/wp-content\/themes\/b5st-child\/images\/h2map\/map-mobile\/mob-Stahl.svg\"><\/div><div><div class=\"mobile-map-info\"><b>Chemie<\/b><br> Verbrauch: 243,4 TWh<\/div><img decoding=\"async\" alt=\"Bedarf Industrie\" src=\"https:\/\/fnb-gas.de\/wp-content\/themes\/b5st-child\/images\/h2map\/map-mobile\/mob-Chemie.svg\"><\/div><div><div class=\"mobile-map-info\"><b>Verkehr Autobahnen<\/b><br>Verbrauch: 89,4 TWh<\/div><img decoding=\"async\" alt=\"Verbrauch Verkehr\" src=\"https:\/\/fnb-gas.de\/wp-content\/themes\/b5st-child\/images\/h2map\/map-mobile\/mob-Verkehr.svg\"><\/div><div><div class=\"mobile-map-info\"><b>W\u00e4rme<\/b><br>58 TWh (Fernw\u00e4rme, H2-Beimischung, Umstellung)<\/div><img decoding=\"async\" alt=\"Verbrauch W\u00e4rme\" src=\"https:\/\/fnb-gas.de\/wp-content\/themes\/b5st-child\/images\/h2map\/map-mobile\/mob-waerme.svg\"><\/div><div class=\"map-mob-legend-header\"><h5>Einspeiseschwerpunkte<\/h5><\/div><div><div class=\"mobile-map-info\"><b>Power-to-Gas (Erzeugung)<\/b><br>Jahresmengen: 164 TWh<br>Inst. Leistung: 63 GW<sub>el<\/sub><\/div><img decoding=\"async\" alt=\"\" src=\"https:\/\/fnb-gas.de\/wp-content\/themes\/b5st-child\/images\/h2map\/map-mobile\/mob-ptg.svg\"><\/div><div><div class=\"mobile-map-info\"><b>Kavernenspeicher<\/b><br>Ausspeicherleistung: 69 GW <br>Einspeicherleistung: 23 GW<br>Arbeitsvolumen:<br> 10,6 Mrd. Nm<sup>3<\/sup> (= 32 TWh)<\/div><img decoding=\"async\" alt=\"\" src=\"https:\/\/fnb-gas.de\/wp-content\/themes\/b5st-child\/images\/h2map\/map-mobile\/mob-kavernen.svg\"><\/div><div><div class=\"mobile-map-info\"><b>Importe<\/b><\/div><img decoding=\"async\" alt=\"Importe\" src=\"https:\/\/fnb-gas.de\/wp-content\/themes\/b5st-child\/images\/h2map\/map-mobile\/mob-importe.svg\"><\/div><div class=\"map-disclaimer\">Bei den Karten handelt es sich um eine schematische Darstellung von Leitungstrassen, in denen auch mehrere Leitungen parallel verlaufen k\u00f6nnen. Leitungstrassen, in denen sowohl umgestellte Leitungen als auch Neubauleitungen parallel verlaufen, werden als Umstellungen dargestellt. Alle Werte in Heizwert (Hi) dargestellt.<\/div><\/div><\/div>\n\n\n\n<div class=\"container-fluid fnb-downloadl-block break-out\">\n    <div class=\"container\">\n\n        <div class=\"row\">\n            <div class=\"col-xs-12\">\n                <h4 class=\"rubrik text-center\">Downloads<\/h4>\n            <\/div>\n\n            <!-- Downloads -->\n            \n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Map H2 network 2050<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">JPEG \/ 215 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/H2-Netz-2050-2.jpg\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Explanatory text H2 network 2050<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 985 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/20211101_FNB_Gas_Erklaertext-H2_Netz_2050.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Presentation Webinar Hydrogen Networks 2030\/2050<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 2 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/12\/2021-12-08_FNB-Gas-Webinar_H2-Netze_2030_2050.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Chart set Scenario 4M FNB Gas<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 978 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/Szenarion-4M_FNB-Gas-fuer-klimaneutrales-H2-Netz.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>2050 Network Explanatory Note<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 283 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/FNB-Gas-Hydrogen-network-2050-for-a-climate-neutral-Germany.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>2050 Hydrogen Network<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">JPG \/ 217 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/12\/FNB-Gas-Hydrogen-Network-2050.jpg\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                        <!-- \/Downloads -->\n\n        <\/div>\n\n    <\/div>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-getwid-accordion__header-wrapper\"><span class=\"wp-block-getwid-accordion__header\"><a href=\"#\"><span class=\"wp-block-getwid-accordion__header-title\"><strong>Hydrogen grid 2030: Towards a climate-neutral Germany<\/strong><\/span><span class=\"wp-block-getwid-accordion__icon is-active\"><i class=\"fas fa-plus\"><\/i><\/span><span class=\"wp-block-getwid-accordion__icon is-passive\"><i class=\"fas fa-minus\"><\/i><\/span><\/a><\/span><\/div><div class=\"wp-block-getwid-accordion__content-wrapper\"><div class=\"wp-block-getwid-accordion__content\">\n<p><em>December 2021<\/em><\/p>\n\n\n\n<p>With the Hydrogen Grid 2030 (in short: H2 Grid 2030), the TSOs are demonstrating solutions as to how transport requirements can be fulfilled on a supraregional basis in a dynamic development of the hydrogen market in the near future. Compared to the H2 starter grid, the H2 grid 2030 is significantly more extensive and now also takes into account the significantly higher volume target for national hydrogen requirements set out in the National Hydrogen Strategy, in the order of 90 to 110 TWh. The basis is a scenario for the production and use of hydrogen in Germany developed together with the consulting firm 4Management based on the recognised dena Leitstudie I (TM95).<a id=\"_ftnref1\" href=\"#_ftn1\">[1]<\/a><\/p>\n\n\n\n<p>The scenario on which the H2 grid 2030 is based includes a hydrogen demand of 71 TWh (calorific value). The network is about 5,100 km long, of which about 3,700 line kilometers are based on converted gas pipelines.<\/p>\n\n\n\n<p><a href=\"https:\/\/fnb-gas.de\/en\/news\/hydrogen-network-2030-towards-a-climate-neutral-germany\/\" target=\"_blank\" rel=\"noreferrer noopener\">Learn more<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"769\" height=\"1024\" src=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/211103_FNB_H2-NETZ_2030-2-769x1024.jpg\" alt=\"\" class=\"wp-image-4330\" style=\"width:769px;height:1024px\" srcset=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/211103_FNB_H2-NETZ_2030-2-769x1024.jpg 769w, https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/211103_FNB_H2-NETZ_2030-2-225x300.jpg 225w, https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/211103_FNB_H2-NETZ_2030-2-768x1023.jpg 768w, https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/211103_FNB_H2-NETZ_2030-2-1153x1536.jpg 1153w, https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/211103_FNB_H2-NETZ_2030-2-1537x2048.jpg 1537w, https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/211103_FNB_H2-NETZ_2030-2.jpg 1882w\" sizes=\"auto, (max-width: 769px) 100vw, 769px\" \/><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-css-opacity\"\/>\n\n\n\n<div class=\"container-fluid fnb-downloadl-block break-out\">\n    <div class=\"container\">\n\n        <div class=\"row\">\n            <div class=\"col-xs-12\">\n                <h4 class=\"rubrik text-center\">Downloads<\/h4>\n            <\/div>\n\n            <!-- Downloads -->\n            \n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Map H2 network 2030<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">JPEG \/ 234 kB \/ EN<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/211103_FNB_H2-NETZ_2030-1-scaled.jpg\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Explanatory text H2 network 2030<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 964 kB \/ EN<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/20211101_FNB_Gas_Erklaertext-H2_Netz_2030.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Presentation Webinar Hydrogen Networks 2030\/2050<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 2 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/12\/2021-12-08_FNB-Gas-Webinar_H2-Netze_2030_2050.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Chart set Scenario 4M FNB Gas<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 861 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/Szenarion-4M_FNB-Gas-fuer-klimaneutrales-H2-Netz-1.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>2030 Network Explanatory Note<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 258 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/FNB-Gas-Hydrogen-network-2030-towards-a-climate-neutral-Germany.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Hydrogen Network 2030<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">JPG \/ 180 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/12\/FNB-Gas-Hydrogen-Network-2030.jpg\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                        <!-- \/Downloads -->\n\n        <\/div>\n\n    <\/div>\n<\/div>\n\n\n<p>[<a href=\"#_ftnref1\" target=\"_blank\" rel=\"noreferrer noopener\">1]<\/a> FNB Gas (2021): Scenario framework for the NEP Gas 2022-2032, p.39<\/p>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-getwid-accordion__header-wrapper\"><span class=\"wp-block-getwid-accordion__header\"><a href=\"#\"><span class=\"wp-block-getwid-accordion__header-title\"><strong>H2 start network 2030<\/strong><\/span><span class=\"wp-block-getwid-accordion__icon is-active\"><i class=\"fas fa-plus\"><\/i><\/span><span class=\"wp-block-getwid-accordion__icon is-passive\"><i class=\"fas fa-minus\"><\/i><\/span><\/a><\/span><\/div><div class=\"wp-block-getwid-accordion__content-wrapper\"><div class=\"wp-block-getwid-accordion__content\">\n<p><em>May 2020<\/em><\/p>\n\n\n\n<p>From vision to implementation: the planning for a hydrogen network in the NEP Gas 2020-2030 confirms essential parts of the visionary H2 network of January 2020. The NDP Gas consultation document published by the transmission system operators on 4 May 2020 includes concrete steps for the development of an H2 network. With the conversion of the first pipelines starting as early as the end of 2022, the core for a Germany-wide H2 network will gradually be created by 2030 (especially in North Rhine-Westphalia and Lower Saxony).<\/p>\n\n\n\n<p>The starting point for the H2 start network 2030 were the projects identified in the market partner survey of the FNB Gas on green gas projects with 31 reports. Among these are projects of large industrial customers, such as steel mills and projects at refinery sites. The H2 start-up network 2030, with a length of over 1,200 km, essentially connects demand centers in North Rhine-Westphalia and Lower Saxony with green gas projects for hydrogen production in northern Germany.<\/p>\n\n\n\n<p><a href=\"https:\/\/fnb-gas.de\/news\/fernleitungsnetzbetreiber-veroeffentlichen-h2-startnetz\/\" target=\"_blank\" rel=\"noreferrer noopener\">Learn more<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"921\" height=\"938\" src=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/fnb_gas_h2_startnetz_2030-scaled-1-927x1024-1.jpg\" alt=\"\" class=\"wp-image-4480\" style=\"width:1006px;height:1024px\" srcset=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/fnb_gas_h2_startnetz_2030-scaled-1-927x1024-1.jpg 921w, https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/fnb_gas_h2_startnetz_2030-scaled-1-927x1024-1-295x300.jpg 295w, https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/fnb_gas_h2_startnetz_2030-scaled-1-927x1024-1-768x782.jpg 768w\" sizes=\"auto, (max-width: 921px) 100vw, 921px\" \/><\/figure>\n\n\n\n<div class=\"container-fluid fnb-downloadl-block break-out\">\n    <div class=\"container\">\n\n        <div class=\"row\">\n            <div class=\"col-xs-12\">\n                <h4 class=\"rubrik text-center\">Downloads<\/h4>\n            <\/div>\n\n            <!-- Downloads -->\n            \n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>H2 start network with explanation<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 260 kB \/ EN<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/09\/h2-startnetz_2030_mit_erlaeuterung-1.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>H2-Starter network with explanatory note<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 258 kB \/ EN<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/09\/explanatory_note_on_the_h2_starter_network_2030-1.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                        <!-- \/Downloads -->\n\n        <\/div>\n\n    <\/div>\n<\/div><\/div><\/div>\n\n\n\n<div class=\"wp-block-getwid-accordion__header-wrapper\"><span class=\"wp-block-getwid-accordion__header\"><a href=\"#\"><span class=\"wp-block-getwid-accordion__header-title\"><strong>Visionary hydrogen network<\/strong><\/span><span class=\"wp-block-getwid-accordion__icon is-active\"><i class=\"fas fa-plus\"><\/i><\/span><span class=\"wp-block-getwid-accordion__icon is-passive\"><i class=\"fas fa-minus\"><\/i><\/span><\/a><\/span><\/div><div class=\"wp-block-getwid-accordion__content-wrapper\"><div class=\"wp-block-getwid-accordion__content\">\n<p><em>January 2020<\/em><\/p>\n\n\n\n<p>All things begin with a vision. In January 2020, the FNB presented its vision for a first Germany-wide hydrogen infrastructure in the form of a network map for the first time. The network has a total length of 5,900 km by 2050, based 90% on existing natural gas pipelines. With the publication of the visionary hydrogen network, the FNB wanted to contribute to the hydrogen strategy announced by the German government and show a first concrete step towards the future hydrogen economy.<\/p>\n\n\n\n<p><a href=\"https:\/\/fnb-gas.de\/news\/fernleitungsnetzbetreiber-veroeffentlichen-karte-fuer-visionaeres-wasserstoffnetz\/\" target=\"_blank\" rel=\"noreferrer noopener\">Learn more<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"927\" height=\"953\" src=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/07\/FNB-Gas-Vision-fuer-ein-H2-Netz_Karte-927x1024-1.jpg\" alt=\"\" class=\"wp-image-10176\" style=\"width:996px;height:1024px\" srcset=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/07\/FNB-Gas-Vision-fuer-ein-H2-Netz_Karte-927x1024-1.jpg 927w, https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/07\/FNB-Gas-Vision-fuer-ein-H2-Netz_Karte-927x1024-1-292x300.jpg 292w, https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/07\/FNB-Gas-Vision-fuer-ein-H2-Netz_Karte-927x1024-1-768x790.jpg 768w\" sizes=\"auto, (max-width: 927px) 100vw, 927px\" \/><\/figure>\n\n\n\n<div class=\"container-fluid fnb-downloadl-block break-out\">\n    <div class=\"container\">\n\n        <div class=\"row\">\n            <div class=\"col-xs-12\">\n                <h4 class=\"rubrik text-center\">Downloads<\/h4>\n            <\/div>\n\n            <!-- Downloads -->\n            \n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>FNB Gas PI publication visionary H2 map<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 375 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/FNB-Gas-PI-Veroeffentlichung-visionaere-H2-Karte.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Explanation of the visionary H2 map<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 275 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/Erlaeuterungen-zur-visionaeren-H2-Karte.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Map vision for H2 network<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">JPG \/ 312 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/FNB-Gas-Vision-fuer-ein-H2-Netz_Karte-scaled.jpg\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Map vision for H2 network<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 2 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/FNB-Gas-Vision-fuer-ein-H2-Netz_Karte.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                        <!-- \/Downloads -->\n\n        <\/div>\n\n    <\/div>\n<\/div><\/div><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Since January 2020, the TSOs have been actively working on the development of the German hydrogen network. Many of the earlier considerations and experiences have been incorporated into the planning and design of the hydrogen core network. The most important milestones to date at a glance:<\/p>\n","protected":false},"author":7,"featured_media":0,"parent":5943,"menu_order":2,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-6627","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Recap: From vision to mission - FNB Gas<\/title>\n<meta name=\"description\" content=\"The amendment to the Energy Industry Act (EnWG) came into force in July 2021. It contains regulations for the transitional regulation of hydrogen networks and important provisions for the development of a hydrogen infrastructure. One component of the amendment is the hydrogen report. This is a report on the current expansion status of the hydrogen network and the development of a future hydrogen network planning with a target year of 2035. The legal basis for the report is \u00a7 28q EnWG.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/fnb-gas.de\/en\/hydrogen-transport\/recap\/\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Hydrogen Report\" \/>\n<meta name=\"twitter:description\" content=\"The amendment to the Energy Industry Act (EnWG) came into force in July 2021. It contains regulations for the transitional regulation of hydrogen networks and important provisions for the development of a hydrogen infrastructure. One component of the amendment is the hydrogen report. This is a report on the current expansion status of the hydrogen network and the development of a future hydrogen network planning with a target year of 2035. The legal basis for the report is \u00a7 28q EnWG.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/08\/hydrogen_greenpipeline_iStock-1404665457-707x300.jpg\" \/>\n<meta name=\"twitter:site\" content=\"@FNB_Gas\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/hydrogen-transport\\\/recap\\\/\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/hydrogen-transport\\\/recap\\\/\",\"name\":\"Recap: From vision to mission - FNB Gas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/hydrogen-transport\\\/recap\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/hydrogen-transport\\\/recap\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/2023-07-12_Karte-Planungsstand-H2-Kernnetz.png\",\"datePublished\":\"2022-09-01T08:00:00+00:00\",\"dateModified\":\"2026-01-05T15:33:33+00:00\",\"description\":\"The amendment to the Energy Industry Act (EnWG) came into force in July 2021. It contains regulations for the transitional regulation of hydrogen networks and important provisions for the development of a hydrogen infrastructure. One component of the amendment is the hydrogen report. This is a report on the current expansion status of the hydrogen network and the development of a future hydrogen network planning with a target year of 2035. The legal basis for the report is \u00a7 28q EnWG.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/hydrogen-transport\\\/recap\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/fnb-gas.de\\\/en\\\/hydrogen-transport\\\/recap\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/hydrogen-transport\\\/recap\\\/#primaryimage\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/2023-07-12_Karte-Planungsstand-H2-Kernnetz.png\",\"contentUrl\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/2023-07-12_Karte-Planungsstand-H2-Kernnetz.png\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/hydrogen-transport\\\/recap\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Hydrogen Network\",\"item\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/hydrogen-transport\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Recap: From vision to mission\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/\",\"name\":\"FNB Gas\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#organization\",\"name\":\"FNB Gas\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/FNB_Gas.png\",\"contentUrl\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/FNB_Gas.png\",\"width\":1300,\"height\":630,\"caption\":\"FNB Gas\"},\"image\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/FNB_Gas\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/73350372\\\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Recap: From vision to mission - FNB Gas","description":"The amendment to the Energy Industry Act (EnWG) came into force in July 2021. It contains regulations for the transitional regulation of hydrogen networks and important provisions for the development of a hydrogen infrastructure. One component of the amendment is the hydrogen report. This is a report on the current expansion status of the hydrogen network and the development of a future hydrogen network planning with a target year of 2035. The legal basis for the report is \u00a7 28q EnWG.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/fnb-gas.de\/en\/hydrogen-transport\/recap\/","twitter_card":"summary_large_image","twitter_title":"Hydrogen Report","twitter_description":"The amendment to the Energy Industry Act (EnWG) came into force in July 2021. It contains regulations for the transitional regulation of hydrogen networks and important provisions for the development of a hydrogen infrastructure. One component of the amendment is the hydrogen report. This is a report on the current expansion status of the hydrogen network and the development of a future hydrogen network planning with a target year of 2035. The legal basis for the report is \u00a7 28q EnWG.","twitter_image":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/08\/hydrogen_greenpipeline_iStock-1404665457-707x300.jpg","twitter_site":"@FNB_Gas","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/fnb-gas.de\/en\/hydrogen-transport\/recap\/","url":"https:\/\/fnb-gas.de\/en\/hydrogen-transport\/recap\/","name":"Recap: From vision to mission - FNB Gas","isPartOf":{"@id":"https:\/\/fnb-gas.de\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/fnb-gas.de\/en\/hydrogen-transport\/recap\/#primaryimage"},"image":{"@id":"https:\/\/fnb-gas.de\/en\/hydrogen-transport\/recap\/#primaryimage"},"thumbnailUrl":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/07\/2023-07-12_Karte-Planungsstand-H2-Kernnetz.png","datePublished":"2022-09-01T08:00:00+00:00","dateModified":"2026-01-05T15:33:33+00:00","description":"The amendment to the Energy Industry Act (EnWG) came into force in July 2021. It contains regulations for the transitional regulation of hydrogen networks and important provisions for the development of a hydrogen infrastructure. One component of the amendment is the hydrogen report. This is a report on the current expansion status of the hydrogen network and the development of a future hydrogen network planning with a target year of 2035. The legal basis for the report is \u00a7 28q EnWG.","breadcrumb":{"@id":"https:\/\/fnb-gas.de\/en\/hydrogen-transport\/recap\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/fnb-gas.de\/en\/hydrogen-transport\/recap\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/fnb-gas.de\/en\/hydrogen-transport\/recap\/#primaryimage","url":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/07\/2023-07-12_Karte-Planungsstand-H2-Kernnetz.png","contentUrl":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/07\/2023-07-12_Karte-Planungsstand-H2-Kernnetz.png"},{"@type":"BreadcrumbList","@id":"https:\/\/fnb-gas.de\/en\/hydrogen-transport\/recap\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/fnb-gas.de\/en\/"},{"@type":"ListItem","position":2,"name":"Hydrogen Network","item":"https:\/\/fnb-gas.de\/en\/hydrogen-transport\/"},{"@type":"ListItem","position":3,"name":"Recap: From vision to mission"}]},{"@type":"WebSite","@id":"https:\/\/fnb-gas.de\/en\/#website","url":"https:\/\/fnb-gas.de\/en\/","name":"FNB Gas","description":"","publisher":{"@id":"https:\/\/fnb-gas.de\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/fnb-gas.de\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/fnb-gas.de\/en\/#organization","name":"FNB Gas","url":"https:\/\/fnb-gas.de\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/fnb-gas.de\/en\/#\/schema\/logo\/image\/","url":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/FNB_Gas.png","contentUrl":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/FNB_Gas.png","width":1300,"height":630,"caption":"FNB Gas"},"image":{"@id":"https:\/\/fnb-gas.de\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/FNB_Gas","https:\/\/www.linkedin.com\/company\/73350372\/"]}]}},"_links":{"self":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/pages\/6627","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/comments?post=6627"}],"version-history":[{"count":37,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/pages\/6627\/revisions"}],"predecessor-version":[{"id":15664,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/pages\/6627\/revisions\/15664"}],"up":[{"embeddable":true,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/pages\/5943"}],"wp:attachment":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/media?parent=6627"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}