{"id":12818,"date":"2024-07-22T17:19:16","date_gmt":"2024-07-22T15:19:16","guid":{"rendered":"https:\/\/fnb-gas.de\/hydrogen-core-network-2\/"},"modified":"2026-03-23T09:22:34","modified_gmt":"2026-03-23T08:22:34","slug":"hydrogen-core-network","status":"publish","type":"page","link":"https:\/\/fnb-gas.de\/en\/hydrogen-transport\/hydrogen-core-network\/","title":{"rendered":"Hydrogen core network"},"content":{"rendered":"\n<p>A milestone for the energy transition: On 22.10.2024, the Federal Network Agency approved the construction of the Germany-wide hydrogen core network. Europe&#8217;s largest hydrogen network will be created by 2032, making it an important pillar of the climate-neutral energy system of the future.   <\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img decoding=\"async\" src=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/12\/20241022_Jahreskarten-1.gif\" alt=\"\"\/><\/figure>\n<\/div>\n\n\n<h5 class=\"wp-block-heading\"><strong>Key data of the approved hydrogen core network<\/strong><\/h5>\n\n\n\n<p>The total length of the approved core network is 9,040 km.  The core network consists mainly of converted natural gas pipelines (around 60%). The investment costs amount to \u20ac 18.9 billion. The feed-in and exit capacities amount to around 101 GW and 87 GW respectively. In addition to the TSO measures, infrastructure from ten DSO core network operators was also approved (468 km).<\/p>\n\n\n\n<p>The core grid meets the targets set out in the EnWG for a Germany-wide, expandable, efficient, climate-friendly and rapidly realizable hydrogen grid by the target year 2032. In order to create more flexibility in the implementation of the projects, the EnWG also provides for the possibility of deferring individual approved core grid measures if certain measures only prove necessary at a later date up to 2037. <\/p>\n\n\n\n<p>The core network puts Germany at the forefront of infrastructure development in Europe. It is the starting signal and the basis for the development of the hydrogen market. The TSOs are thus making an advance payment: the core network is the offer to the market, it comes for the market and continues to develop with it.  <\/p>\n\n\n\n<div class=\"fnb-zitat-block\">\n    <div class=\"fnb-zitat-wrap  stil-quotes\">\n        <span class=\"zitat-line\"><\/span>\n        <div class=\"fnb-zitat\"><span>With the hydrogen core network, we are laying the foundation for a new energy system. It offers a historic opportunity for Germany to position itself as a pioneer in the hydrogen economy. In doing so, we are making an advance contribution to transmission system operators and creating the basis for a climate-neutral industry and energy supply. The development of the H2 market is now a joint task: all players are required to actively drive forward the ramp-up. Especially in the current economic situation, this requires favorable framework conditions to trigger private investment along the entire H2 value chain.    <\/span><\/div>\n                                    <div class=\"fnb-zitat-autor\">Dr. Thomas G\u00f6\u00dfmann, Chairman of the Board FNB Gas<\/div>\n                 <span class=\"zitat-line\"><\/span>\n        <\/div>\n\n    <\/div>\n\n\n<p>The TSOs have already started building the core network. The first pipelines have already been converted to hydrogen this year.<\/p>\n\n\n\n<h5 class=\"wp-block-heading\"><strong>Outlook: What happens next?<\/strong><\/h5>\n\n\n\n<p>On 14 July 2025, the Federal Network Agency set a ramp-up fee of \u20ac25\/kWh\/h\/a for 2025. The ramp-up fee enables the refinancing of the development of the hydrogen core network and is intended to balance the amortisation account by 2055.<\/p>\n\n\n\n<p>With the WaKandA and WasABi determinations, the Federal Network Agency (BNetzA) has established the fundamental rules for the marketing and settlement of capacities, as well as for balancing in the hydrogen market, which are to be applied starting January 1, 2028. These regulations are being further developed in the ongoing process of creating common contract standards for grid access through a hydrogen cooperation agreement by the negotiating delegation of the associations BDEW, VKU, and GEODE.<\/p>\n\n\n\n<p>On March 19, 2026, a major milestone was reached: for the first time, companies can reserve transport capacities in the hydrogen core network and secure entry and exit capacities well in advance. The basis for this is the market information package published on March 5, 2026, which describes the cluster structure, the amount of reservable capacities, and the standardized reservation process.<\/p>\n\n\n\n<p>For the market ramp-up to succeed overall, it is important that policymakers create reliable framework conditions for the hydrogen ramp-up on the generation and demand side. Another focus is on the further development of the core network in order to take additional requirements and locations into account as part of integrated network development planning for gas and hydrogen (stage 2). The transformation of the distribution grids is also important for this in order to develop an area-wide hydrogen grid.  <\/p>\n\n\n\n<p>The review and further development of the core network, as required by law, takes place every two years as part of the rolling process of network development planning. More information on this can be found on the website of the <a href=\"https:\/\/ko-nep.de\/en\/\" target=\"_blank\" rel=\"noreferrer noopener\">Coordination Office for Network Development Planning for Gas and Hydrogen (KO.NEP)<\/a>.<\/p>\n\n\n\n<h5 class=\"wp-block-heading\"><strong>Video message from Barbara Fischer, Managing Director of FNB Gas, on the occasion of the approval of the hydrogen core network<\/strong>:<\/h5>\n\n\n\n<figure class=\"wp-block-video\"><video height=\"360\" style=\"aspect-ratio: 640 \/ 360;\" width=\"640\" controls src=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/10\/24-10-22_FNB-Gas_Videostatement-Fischer-zu-Kernnetzgenehmigung.mov\"><\/video><\/figure>\n\n\n\n<div class=\"container-fluid fnb-downloadl-block break-out\">\n    <div class=\"container\">\n\n        <div class=\"row\">\n            <div class=\"col-xs-12\">\n                <h4 class=\"rubrik text-center\">Downloads<\/h4>\n            <\/div>\n\n            <!-- Downloads -->\n            \n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Approval of the hydrogen core network<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 2 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/10\/Genehmigung-des-Wasserstoff-Kernnetzes.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Press release<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 802 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/10\/2024-10-22_FNB-Gas_Pressemitteilung_Genehmigung-Wasserstoff-Kernnetz.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Map hydrogen core network 2032<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PNG \/ 2 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/10\/20241022_FNB-Gas_Wasserstoff-Kernnetz_Karte.png\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Annex 2 &#8211; Pipeline notifications from other potential hydrogen network operators (inofficial revision according to the approval dated 22\/10\/2024)<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">XLSX \/ 55 kB  <\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/12\/2024_12_10_Wasserstoff-Kernnetz_Anlage2_final_inoffiziell.xlsx\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Annex 3 &#8211; List of measures for new construction of the FNB (inofficial revision according to the approval dated 22\/10\/2024)<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">XLSX \/ 72 kB  <\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/12\/2024_12_10_Wasserstoff-Kernnetz_Anlage3_final_inoffiziell.xlsx\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Annex 4 &#8211; List of measures for the conversion of the FNB (not part of the approval)<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">XLSX \/ 84 kB  <\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/12\/2024_12_10_Wasserstoff-Kernnetz_Anlage4_final_inoffiziell.xlsx\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Annex 5 &#8211; List of natural gas enhancing measures of the TSO (inofficial revision according to the approval dated 22\/10\/2024)<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">XLSX \/ 70 kB  <\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/12\/2024_12_10_Wasserstoff-Kernnetz_Anlage5_final_inoffiziell.xlsx\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Annex 6 &#8211; Detailed map of measures (inofficial revision according to the approval dated 22\/10\/2024)<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 2 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2025\/03\/2024_11_29_Anlage-6-mit-Anleitung.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                        <!-- \/Downloads -->\n\n        <\/div>\n\n    <\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>A milestone for the energy transition: On 22.10.2024, the Federal Network Agency approved the construction of the Germany-wide hydrogen core network. Europe&#8217;s largest hydrogen network will be created by 2032, making it an important pillar of the climate-neutral energy system of the future. Key data of the approved hydrogen core network The total length of [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":10152,"parent":5943,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-12818","page","type-page","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Hydrogen core network - FNB Gas<\/title>\n<meta name=\"description\" content=\"The transmission system operators published the planning status for a future Germany-wide hydrogen core network on July 12, 2023. This current planning status does not yet correspond to the final design of the hydrogen core network.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/fnb-gas.de\/en\/hydrogen-transport\/hydrogen-core-network\/\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Hydrogen core network\" \/>\n<meta name=\"twitter:description\" content=\"The transmission system operators published the planning status for a future Germany-wide hydrogen core network on July 12, 2023. This current planning status does not yet correspond to the final design of the hydrogen core network.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/07\/80943250-57C8-4639-AD53-7DE08FBE8FD3_1_201_a-706x300.jpeg\" \/>\n<meta name=\"twitter:site\" content=\"@FNB_Gas\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/hydrogen-transport\\\/hydrogen-core-network\\\/\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/hydrogen-transport\\\/hydrogen-core-network\\\/\",\"name\":\"Hydrogen core network - FNB Gas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/hydrogen-transport\\\/hydrogen-core-network\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/hydrogen-transport\\\/hydrogen-core-network\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/5D9BE6EE-5DB5-47CE-ABE7-6BD336DB1FCD_1_201_a-scaled.jpeg\",\"datePublished\":\"2024-07-22T15:19:16+00:00\",\"dateModified\":\"2026-03-23T08:22:34+00:00\",\"description\":\"The transmission system operators published the planning status for a future Germany-wide hydrogen core network on July 12, 2023. This current planning status does not yet correspond to the final design of the hydrogen core network.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/hydrogen-transport\\\/hydrogen-core-network\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/fnb-gas.de\\\/en\\\/hydrogen-transport\\\/hydrogen-core-network\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/hydrogen-transport\\\/hydrogen-core-network\\\/#primaryimage\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/5D9BE6EE-5DB5-47CE-ABE7-6BD336DB1FCD_1_201_a-scaled.jpeg\",\"contentUrl\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/5D9BE6EE-5DB5-47CE-ABE7-6BD336DB1FCD_1_201_a-scaled.jpeg\",\"width\":2560,\"height\":1087},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/hydrogen-transport\\\/hydrogen-core-network\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Hydrogen Network\",\"item\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/hydrogen-transport\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Hydrogen core network\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/\",\"name\":\"FNB Gas\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#organization\",\"name\":\"FNB Gas\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/FNB_Gas.png\",\"contentUrl\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/FNB_Gas.png\",\"width\":1300,\"height\":630,\"caption\":\"FNB Gas\"},\"image\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/FNB_Gas\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/73350372\\\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Hydrogen core network - FNB Gas","description":"The transmission system operators published the planning status for a future Germany-wide hydrogen core network on July 12, 2023. This current planning status does not yet correspond to the final design of the hydrogen core network.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/fnb-gas.de\/en\/hydrogen-transport\/hydrogen-core-network\/","twitter_card":"summary_large_image","twitter_title":"Hydrogen core network","twitter_description":"The transmission system operators published the planning status for a future Germany-wide hydrogen core network on July 12, 2023. This current planning status does not yet correspond to the final design of the hydrogen core network.","twitter_image":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/07\/80943250-57C8-4639-AD53-7DE08FBE8FD3_1_201_a-706x300.jpeg","twitter_site":"@FNB_Gas","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/fnb-gas.de\/en\/hydrogen-transport\/hydrogen-core-network\/","url":"https:\/\/fnb-gas.de\/en\/hydrogen-transport\/hydrogen-core-network\/","name":"Hydrogen core network - FNB Gas","isPartOf":{"@id":"https:\/\/fnb-gas.de\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/fnb-gas.de\/en\/hydrogen-transport\/hydrogen-core-network\/#primaryimage"},"image":{"@id":"https:\/\/fnb-gas.de\/en\/hydrogen-transport\/hydrogen-core-network\/#primaryimage"},"thumbnailUrl":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/07\/5D9BE6EE-5DB5-47CE-ABE7-6BD336DB1FCD_1_201_a-scaled.jpeg","datePublished":"2024-07-22T15:19:16+00:00","dateModified":"2026-03-23T08:22:34+00:00","description":"The transmission system operators published the planning status for a future Germany-wide hydrogen core network on July 12, 2023. This current planning status does not yet correspond to the final design of the hydrogen core network.","breadcrumb":{"@id":"https:\/\/fnb-gas.de\/en\/hydrogen-transport\/hydrogen-core-network\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/fnb-gas.de\/en\/hydrogen-transport\/hydrogen-core-network\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/fnb-gas.de\/en\/hydrogen-transport\/hydrogen-core-network\/#primaryimage","url":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/07\/5D9BE6EE-5DB5-47CE-ABE7-6BD336DB1FCD_1_201_a-scaled.jpeg","contentUrl":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/07\/5D9BE6EE-5DB5-47CE-ABE7-6BD336DB1FCD_1_201_a-scaled.jpeg","width":2560,"height":1087},{"@type":"BreadcrumbList","@id":"https:\/\/fnb-gas.de\/en\/hydrogen-transport\/hydrogen-core-network\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/fnb-gas.de\/en\/"},{"@type":"ListItem","position":2,"name":"Hydrogen Network","item":"https:\/\/fnb-gas.de\/en\/hydrogen-transport\/"},{"@type":"ListItem","position":3,"name":"Hydrogen core network"}]},{"@type":"WebSite","@id":"https:\/\/fnb-gas.de\/en\/#website","url":"https:\/\/fnb-gas.de\/en\/","name":"FNB Gas","description":"","publisher":{"@id":"https:\/\/fnb-gas.de\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/fnb-gas.de\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/fnb-gas.de\/en\/#organization","name":"FNB Gas","url":"https:\/\/fnb-gas.de\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/fnb-gas.de\/en\/#\/schema\/logo\/image\/","url":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/FNB_Gas.png","contentUrl":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/FNB_Gas.png","width":1300,"height":630,"caption":"FNB Gas"},"image":{"@id":"https:\/\/fnb-gas.de\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/FNB_Gas","https:\/\/www.linkedin.com\/company\/73350372\/"]}]}},"_links":{"self":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/pages\/12818","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/comments?post=12818"}],"version-history":[{"count":49,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/pages\/12818\/revisions"}],"predecessor-version":[{"id":16170,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/pages\/12818\/revisions\/16170"}],"up":[{"embeddable":true,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/pages\/5943"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/media\/10152"}],"wp:attachment":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/media?parent=12818"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}