{"id":9073,"date":"2022-12-16T09:00:00","date_gmt":"2022-12-16T08:00:00","guid":{"rendered":"https:\/\/fnb-gas.de\/news\/secure-energy-supply-through-transport-capacities-for-lng-plants\/"},"modified":"2022-12-21T15:21:11","modified_gmt":"2022-12-21T14:21:11","slug":"transmission-capacities-for-lng-facilities-help-to-ensure-secure-energy-supplies","status":"publish","type":"news","link":"https:\/\/fnb-gas.de\/en\/news\/transmission-capacities-for-lng-facilities-help-to-ensure-secure-energy-supplies\/","title":{"rendered":"Transmission capacities for LNG facilities help to ensure secure energy supplies"},"content":{"rendered":"\n<p><strong>The German gas transmission system operators (TSOs) have today launched their consultation process on the Gas Network Development Plan (Gas NDP) 2022-2032. The new LNGplus security of supply variants reflect the dramatically changed supply situation. The TSOs are therefore pushing ahead with projects to connect LNG facilities and provide the necessary transmission capacities. The first LNG facilities will be connected to the grid by the end of 2022.<\/strong><\/p>\n\n\n\n<!--more-->\n\n\n\n<p>Dr Thomas G\u00f6\u00dfmann, Chairman of the Board of FNB Gas, said: &#8220;Security of supply is a precious asset for the people in Germany and for the country as an industrial location. The gas TSOs are doing all they can to adapt the pipeline transmission system as quickly as possible to the changed geopolitical situation and energy industry requirements to continue to ensure secure and, in the future, climateneutral gas transmission.&#8221;<\/p>\n\n\n\n<p>The Gas NDP 2022-2032 is based on the Scenario Framework confirmed by the Federal Network Agency (BNetzA) in January 2022 as well as the BNetzA\u2019s more recent decision of 11 November 2022 on the supplemented Scenario Framework. Market players can now submit their comments on the Gas NDP 2022-2032 consultation document until 31 January 2023. A virtual consultation workshop will be held on 24 January 2023.<\/p>\n\n\n\n<p>The changes in the energy landscape have a major impact on network development planning in Germany. With their LNGplus supply security variants developed in consultation with BNetzA, the TSOs have made appropriate modifications to their Gas Network Development Plan 2022-2032 to responded to new challenges such as greatly changed load flows.<\/p>\n\n\n\n<p>The two most efficient LNGplus supply security variants differ in terms of their supply routes in Germany. The CAPEX requirements for the necessary network expansions are very similar at around 4.1 and 4.2 billion euros. For this reason, the TSOs have decided not to make any specific network expansion proposal at this stage and put the expansion projects for the LNGplus supply security variants up for consultation.<\/p>\n\n\n\n<div class=\"container-fluid fnb-downloadl-block break-out\">\n    <div class=\"container\">\n\n        <div class=\"row\">\n            <div class=\"col-xs-12\">\n                <h4 class=\"rubrik text-center\">Downloads<\/h4>\n            <\/div>\n\n            <!-- Downloads -->\n            \n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Gas NDP 2022-2032<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 12 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/12\/2022_12_21_FNB_GAS_Consultation-Gas-NDP-2022.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Gas NDP 2022-2032 Summary<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 826 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/12\/2022_12_21_FNB_GAS_Consultation-Gas-NDP-2022_Summary.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Appendix 1 Analysis of additional demands<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 116 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/12\/2022_12_21_FNB_GAS_Consultation-Gas-NDP-2022_Appendix_1_Analysis_additional-demand.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Appendix 2 Project reports WEB<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">Excel \/ 682 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/12\/2022_12_21_FNB_GAS_Consultation-Gas-NDP-2022_Appendix-2_Project-reports-WEB.xlsx\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Appendix 3 Results pipeline network infrastructure<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">Excel \/ 82 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/12\/2022_12_21_FNB_GAS_Consultation-NEP-2022_Appendix_3_Results-pipeline-network-infrastructure.xlsx\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Appendix 4 Overview maps infrastructure<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 23 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/12\/2022_12_21_FNB_GAS_Consultation-Gas-NDP-2022_Appendix_4_Overview-maps-infrastructure.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Appendix 5 Hydrogen review results<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 138 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/12\/2022_12_21_FNB_GAS_Consultation-Gas-NDP-2022_Appendix_5_Hydrogen-Review-Results.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Appendix 6 Network expansion measures<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 53 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/12\/2022_12_21_FNB_GAS_Consultation-Gas-NDP-2022_Appendix_6_Network-expansion-measures.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Press Release Consultation Gas NDP 2022-2032<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 162 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/12\/2022_12_16_FNB-Gas-PR-Consultation-Gas-NDP-2022-2032_EN.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                        <!-- \/Downloads -->\n\n        <\/div>\n\n    <\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Transmission system operators (TSOs) today launch the consultation on the 2022-2032 gas network development plan (NEP Gas). The new LNGplus supply security variants take into account the profound changes in the energy supply situation. Measures to connect LNG plants and provide the necessary transport capacities are being implemented at full speed by the TSOs. The first grid connections for LNG plants will be completed by the end of 2022.<\/p>\n","protected":false},"featured_media":9070,"parent":0,"template":"","meta":{"_acf_changed":false,"footnotes":""},"news_resort":[68,66,67],"news_types":[102],"class_list":["post-9073","news","type-news","status-publish","has-post-thumbnail","hentry","news_resort-hydrogen-network","news_resort-network-development-plan","news_resort-security-of-supply","news_types-news-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Transmission capacities for LNG facilities help to ensure secure energy supplies - FNB Gas<\/title>\n<meta name=\"description\" content=\"Transmission system operators (TSOs) today launch the consultation on the 2022-2032 gas network development plan (NEP Gas). The new LNGplus supply security variants take into account the profound changes in the energy supply situation. Measures to connect LNG plants and provide the necessary transport capacities are being implemented at full speed by the TSOs. The first grid connections for LNG plants will be completed by the end of 2022.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/fnb-gas.de\/en\/news\/transmission-capacities-for-lng-facilities-help-to-ensure-secure-energy-supplies\/\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Transmission capacities for LNG facilities help to ensure secure energy supplies\" \/>\n<meta name=\"twitter:description\" content=\"The German gas transmission system operators (TSOs) have today launched their consultation process on the Gas Network Development Plan (Gas NDP) 2022-2032. The new LNGplus security of supply variants reflect the dramatically changed supply situation. The TSOs are therefore pushing ahead with projects to connect LNG facilities and provide the necessary transmission capacities. The first LNG facilities will be connected to the grid by the end of 2022.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/12\/LNG-Tanker.jpeg\" \/>\n<meta name=\"twitter:site\" content=\"@FNB_Gas\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/transmission-capacities-for-lng-facilities-help-to-ensure-secure-energy-supplies\\\/\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/transmission-capacities-for-lng-facilities-help-to-ensure-secure-energy-supplies\\\/\",\"name\":\"Transmission capacities for LNG facilities help to ensure secure energy supplies - FNB Gas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/transmission-capacities-for-lng-facilities-help-to-ensure-secure-energy-supplies\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/transmission-capacities-for-lng-facilities-help-to-ensure-secure-energy-supplies\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2022\\\/12\\\/LNG-Tanker.jpeg\",\"datePublished\":\"2022-12-16T08:00:00+00:00\",\"dateModified\":\"2022-12-21T14:21:11+00:00\",\"description\":\"Transmission system operators (TSOs) today launch the consultation on the 2022-2032 gas network development plan (NEP Gas). The new LNGplus supply security variants take into account the profound changes in the energy supply situation. Measures to connect LNG plants and provide the necessary transport capacities are being implemented at full speed by the TSOs. The first grid connections for LNG plants will be completed by the end of 2022.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/transmission-capacities-for-lng-facilities-help-to-ensure-secure-energy-supplies\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/transmission-capacities-for-lng-facilities-help-to-ensure-secure-energy-supplies\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/transmission-capacities-for-lng-facilities-help-to-ensure-secure-energy-supplies\\\/#primaryimage\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2022\\\/12\\\/LNG-Tanker.jpeg\",\"contentUrl\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2022\\\/12\\\/LNG-Tanker.jpeg\",\"width\":2129,\"height\":904},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/transmission-capacities-for-lng-facilities-help-to-ensure-secure-energy-supplies\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Transmission capacities for LNG facilities help to ensure secure energy supplies\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/\",\"name\":\"FNB Gas\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#organization\",\"name\":\"FNB Gas\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/FNB_Gas.png\",\"contentUrl\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/FNB_Gas.png\",\"width\":1300,\"height\":630,\"caption\":\"FNB Gas\"},\"image\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/FNB_Gas\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/73350372\\\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Transmission capacities for LNG facilities help to ensure secure energy supplies - FNB Gas","description":"Transmission system operators (TSOs) today launch the consultation on the 2022-2032 gas network development plan (NEP Gas). The new LNGplus supply security variants take into account the profound changes in the energy supply situation. Measures to connect LNG plants and provide the necessary transport capacities are being implemented at full speed by the TSOs. The first grid connections for LNG plants will be completed by the end of 2022.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/fnb-gas.de\/en\/news\/transmission-capacities-for-lng-facilities-help-to-ensure-secure-energy-supplies\/","twitter_card":"summary_large_image","twitter_title":"Transmission capacities for LNG facilities help to ensure secure energy supplies","twitter_description":"The German gas transmission system operators (TSOs) have today launched their consultation process on the Gas Network Development Plan (Gas NDP) 2022-2032. The new LNGplus security of supply variants reflect the dramatically changed supply situation. The TSOs are therefore pushing ahead with projects to connect LNG facilities and provide the necessary transmission capacities. The first LNG facilities will be connected to the grid by the end of 2022.","twitter_image":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/12\/LNG-Tanker.jpeg","twitter_site":"@FNB_Gas","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/fnb-gas.de\/en\/news\/transmission-capacities-for-lng-facilities-help-to-ensure-secure-energy-supplies\/","url":"https:\/\/fnb-gas.de\/en\/news\/transmission-capacities-for-lng-facilities-help-to-ensure-secure-energy-supplies\/","name":"Transmission capacities for LNG facilities help to ensure secure energy supplies - FNB Gas","isPartOf":{"@id":"https:\/\/fnb-gas.de\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/fnb-gas.de\/en\/news\/transmission-capacities-for-lng-facilities-help-to-ensure-secure-energy-supplies\/#primaryimage"},"image":{"@id":"https:\/\/fnb-gas.de\/en\/news\/transmission-capacities-for-lng-facilities-help-to-ensure-secure-energy-supplies\/#primaryimage"},"thumbnailUrl":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/12\/LNG-Tanker.jpeg","datePublished":"2022-12-16T08:00:00+00:00","dateModified":"2022-12-21T14:21:11+00:00","description":"Transmission system operators (TSOs) today launch the consultation on the 2022-2032 gas network development plan (NEP Gas). The new LNGplus supply security variants take into account the profound changes in the energy supply situation. Measures to connect LNG plants and provide the necessary transport capacities are being implemented at full speed by the TSOs. The first grid connections for LNG plants will be completed by the end of 2022.","breadcrumb":{"@id":"https:\/\/fnb-gas.de\/en\/news\/transmission-capacities-for-lng-facilities-help-to-ensure-secure-energy-supplies\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/fnb-gas.de\/en\/news\/transmission-capacities-for-lng-facilities-help-to-ensure-secure-energy-supplies\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/fnb-gas.de\/en\/news\/transmission-capacities-for-lng-facilities-help-to-ensure-secure-energy-supplies\/#primaryimage","url":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/12\/LNG-Tanker.jpeg","contentUrl":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/12\/LNG-Tanker.jpeg","width":2129,"height":904},{"@type":"BreadcrumbList","@id":"https:\/\/fnb-gas.de\/en\/news\/transmission-capacities-for-lng-facilities-help-to-ensure-secure-energy-supplies\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/fnb-gas.de\/en\/"},{"@type":"ListItem","position":2,"name":"Transmission capacities for LNG facilities help to ensure secure energy supplies"}]},{"@type":"WebSite","@id":"https:\/\/fnb-gas.de\/en\/#website","url":"https:\/\/fnb-gas.de\/en\/","name":"FNB Gas","description":"","publisher":{"@id":"https:\/\/fnb-gas.de\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/fnb-gas.de\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/fnb-gas.de\/en\/#organization","name":"FNB Gas","url":"https:\/\/fnb-gas.de\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/fnb-gas.de\/en\/#\/schema\/logo\/image\/","url":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/FNB_Gas.png","contentUrl":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/FNB_Gas.png","width":1300,"height":630,"caption":"FNB Gas"},"image":{"@id":"https:\/\/fnb-gas.de\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/FNB_Gas","https:\/\/www.linkedin.com\/company\/73350372\/"]}]}},"_links":{"self":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news\/9073","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/types\/news"}],"version-history":[{"count":22,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news\/9073\/revisions"}],"predecessor-version":[{"id":9395,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news\/9073\/revisions\/9395"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/media\/9070"}],"wp:attachment":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/media?parent=9073"}],"wp:term":[{"taxonomy":"news_resort","embeddable":true,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news_resort?post=9073"},{"taxonomy":"news_types","embeddable":true,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news_types?post=9073"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}