{"id":11955,"date":"2024-02-09T15:57:08","date_gmt":"2024-02-09T14:57:08","guid":{"rendered":"https:\/\/fnb-gas.de\/news\/tsos-request-capacity-reservations-and-capacity-expansion-entitlements-pursuant-to-sections-38-39-gasnzv-for-storage-production-and-lng-facilities-and-power-plants\/"},"modified":"2024-02-12T09:55:07","modified_gmt":"2024-02-12T08:55:07","slug":"tsos-request-capacity-reservations-and-capacity-expansion-entitlements-pursuant-to-sections-38-39-gasnzv-for-storage-production-and-lng-facilities-and-power-plants","status":"publish","type":"news","link":"https:\/\/fnb-gas.de\/en\/news\/tsos-request-capacity-reservations-and-capacity-expansion-entitlements-pursuant-to-sections-38-39-gasnzv-for-storage-production-and-lng-facilities-and-power-plants\/","title":{"rendered":"TSOs request capacity reservations and capacity expansion entitlements pursuant to sections 38\/39 GasNZV for storage, production and LNG facilities and power plants"},"content":{"rendered":"\n<p><strong>Preparatory work for the first integrated network development plan for gas and hydrogen 2025 continues to progress<\/strong><\/p>\n\n<!--more-->\n\n<p>According to the federal government&#8217;s draft legislation, the TSOs and the regulated operators of hydrogen transport networks must prepare the scenario framework for the first integrated gas and hydrogen network development plan by June 30, 2024. To determine the capacity requirements in the transmission system, the TSOs are now requesting capacity reservations and capacity expansion entitlements in accordance with sections 38\/39 GasNZV for storage facilities, production and LNG facilities and power plants. The aforementioned market participants are called upon to report their capacity reservations and capacity expansion claims by May 1, 2024. To this end, the TSOs have published <a href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/02\/2024_01_30_%C2%A7%C2%A7-3839_Kriterien.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">criteria<\/a> on the TSO Gas website that must also be met by May 1, 2024 in order to be included in the scenario framework.<\/p>\n\n<p>The TSOs explicitly point out a procedural change compared to the previous network development plan processes due to the planned new legal requirements in the Energy Industry Act on integrated network development planning for gas and hydrogen. After that, the scenario framework will no longer be consulted by the transmission system operators, but by the Federal Network Agency. In the opinion of the BNetzA, requests received by the BNetzA during the consultation and thus after the submission of the scenario framework by the TSOs or a later submission directly to the BNetzA is therefore excluded. Accordingly, only the requests received by May 1, 2024 can be considered in the 2024 scenario framework and in the integrated gas and hydrogen network development plan 2025.<strong><\/strong><\/p>\n\n<div class=\"container-fluid fnb-downloadl-block break-out\">\n    <div class=\"container\">\n\n        <div class=\"row\">\n            <div class=\"col-xs-12\">\n                <h4 class=\"rubrik text-center\">Downloads<\/h4>\n            <\/div>\n\n            <!-- Downloads -->\n            \n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>PM on deadline for \u00a7\u00a7 38\/39 GasNZV<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 163 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/02\/2024-02-12_FNB-Gas_PM-zu-Stichtag-fuer-\u00a7\u00a7-38_39-GasNZV.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>\u00a7\u00a7 Sections 38\/39 GasNZV Criteria<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 160 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2024\/02\/2024_01_30_\u00a7\u00a7-3839_Kriterien.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                        <!-- \/Downloads -->\n\n        <\/div>\n\n    <\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Preparatory work for the first integrated network development plan for gas and hydrogen 2025 continues to progress<\/p>\n","protected":false},"featured_media":8237,"parent":0,"template":"","meta":{"_acf_changed":false,"footnotes":""},"news_resort":[66],"news_types":[102],"class_list":["post-11955","news","type-news","status-publish","has-post-thumbnail","hentry","news_resort-network-development-plan","news_types-news-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>TSOs request capacity reservations and capacity expansion entitlements pursuant to sections 38\/39 GasNZV for storage, production and LNG facilities and power plants - FNB Gas<\/title>\n<meta name=\"description\" content=\"According to the federal government&#039;s draft legislation, the TSOs and the regulated operators of hydrogen transport networks must prepare the scenario framework for the first integrated gas and hydrogen network development plan by June 30, 2024. To determine the capacity requirements in the transmission system, the TSOs are now requesting capacity reservations and capacity expansion entitlements in accordance with sections 38\/39 GasNZV for storage facilities, production and LNG facilities and power plants. The aforementioned market participants are called upon to report their capacity reservations and capacity expansion claims by May 1, 2024. To this end, the TSOs have published criteria on the TSO Gas website that must also be met by May 1, 2024 in order to be included in the scenario framework.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/fnb-gas.de\/en\/news\/tsos-request-capacity-reservations-and-capacity-expansion-entitlements-pursuant-to-sections-38-39-gasnzv-for-storage-production-and-lng-facilities-and-power-plants\/\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Transmission system operators request capacity reservations and capacity expansion claims pursuant to sections 38\/39 GasNZV for storage, production and LNG facilities and power plants\" \/>\n<meta name=\"twitter:description\" content=\"According to the federal government&#039;s draft legislation, the TSOs and the regulated operators of hydrogen transport networks must prepare the scenario framework for the first integrated gas and hydrogen network development plan by June 30, 2024. To determine the capacity requirements in the transmission system, the TSOs are now requesting capacity reservations and capacity expansion entitlements in accordance with sections 38\/39 GasNZV for storage facilities, production and LNG facilities and power plants. The aforementioned market participants are called upon to report their capacity reservations and capacity expansion claims by May 1, 2024. To this end, the TSOs have published criteria on the TSO Gas website that must also be met by May 1, 2024 in order to be included in the scenario framework.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/09\/572C4E74-33E0-4101-9AC9-D7DC5518C57E_1_105_c-707x300.jpeg\" \/>\n<meta name=\"twitter:site\" content=\"@FNB_Gas\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/tsos-request-capacity-reservations-and-capacity-expansion-entitlements-pursuant-to-sections-38-39-gasnzv-for-storage-production-and-lng-facilities-and-power-plants\\\/\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/tsos-request-capacity-reservations-and-capacity-expansion-entitlements-pursuant-to-sections-38-39-gasnzv-for-storage-production-and-lng-facilities-and-power-plants\\\/\",\"name\":\"TSOs request capacity reservations and capacity expansion entitlements pursuant to sections 38\\\/39 GasNZV for storage, production and LNG facilities and power plants - FNB Gas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/tsos-request-capacity-reservations-and-capacity-expansion-entitlements-pursuant-to-sections-38-39-gasnzv-for-storage-production-and-lng-facilities-and-power-plants\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/tsos-request-capacity-reservations-and-capacity-expansion-entitlements-pursuant-to-sections-38-39-gasnzv-for-storage-production-and-lng-facilities-and-power-plants\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2022\\\/08\\\/Erledigt_Liste-4539382_1920.jpg\",\"datePublished\":\"2024-02-09T14:57:08+00:00\",\"dateModified\":\"2024-02-12T08:55:07+00:00\",\"description\":\"According to the federal government's draft legislation, the TSOs and the regulated operators of hydrogen transport networks must prepare the scenario framework for the first integrated gas and hydrogen network development plan by June 30, 2024. To determine the capacity requirements in the transmission system, the TSOs are now requesting capacity reservations and capacity expansion entitlements in accordance with sections 38\\\/39 GasNZV for storage facilities, production and LNG facilities and power plants. The aforementioned market participants are called upon to report their capacity reservations and capacity expansion claims by May 1, 2024. To this end, the TSOs have published criteria on the TSO Gas website that must also be met by May 1, 2024 in order to be included in the scenario framework.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/tsos-request-capacity-reservations-and-capacity-expansion-entitlements-pursuant-to-sections-38-39-gasnzv-for-storage-production-and-lng-facilities-and-power-plants\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/tsos-request-capacity-reservations-and-capacity-expansion-entitlements-pursuant-to-sections-38-39-gasnzv-for-storage-production-and-lng-facilities-and-power-plants\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/tsos-request-capacity-reservations-and-capacity-expansion-entitlements-pursuant-to-sections-38-39-gasnzv-for-storage-production-and-lng-facilities-and-power-plants\\\/#primaryimage\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2022\\\/08\\\/Erledigt_Liste-4539382_1920.jpg\",\"contentUrl\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2022\\\/08\\\/Erledigt_Liste-4539382_1920.jpg\",\"width\":1920,\"height\":815},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/tsos-request-capacity-reservations-and-capacity-expansion-entitlements-pursuant-to-sections-38-39-gasnzv-for-storage-production-and-lng-facilities-and-power-plants\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"TSOs request capacity reservations and capacity expansion entitlements pursuant to sections 38\\\/39 GasNZV for storage, production and LNG facilities and power plants\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/\",\"name\":\"FNB Gas\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#organization\",\"name\":\"FNB Gas\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/FNB_Gas.png\",\"contentUrl\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/FNB_Gas.png\",\"width\":1300,\"height\":630,\"caption\":\"FNB Gas\"},\"image\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/FNB_Gas\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/73350372\\\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"TSOs request capacity reservations and capacity expansion entitlements pursuant to sections 38\/39 GasNZV for storage, production and LNG facilities and power plants - FNB Gas","description":"According to the federal government's draft legislation, the TSOs and the regulated operators of hydrogen transport networks must prepare the scenario framework for the first integrated gas and hydrogen network development plan by June 30, 2024. To determine the capacity requirements in the transmission system, the TSOs are now requesting capacity reservations and capacity expansion entitlements in accordance with sections 38\/39 GasNZV for storage facilities, production and LNG facilities and power plants. The aforementioned market participants are called upon to report their capacity reservations and capacity expansion claims by May 1, 2024. To this end, the TSOs have published criteria on the TSO Gas website that must also be met by May 1, 2024 in order to be included in the scenario framework.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/fnb-gas.de\/en\/news\/tsos-request-capacity-reservations-and-capacity-expansion-entitlements-pursuant-to-sections-38-39-gasnzv-for-storage-production-and-lng-facilities-and-power-plants\/","twitter_card":"summary_large_image","twitter_title":"Transmission system operators request capacity reservations and capacity expansion claims pursuant to sections 38\/39 GasNZV for storage, production and LNG facilities and power plants","twitter_description":"According to the federal government's draft legislation, the TSOs and the regulated operators of hydrogen transport networks must prepare the scenario framework for the first integrated gas and hydrogen network development plan by June 30, 2024. To determine the capacity requirements in the transmission system, the TSOs are now requesting capacity reservations and capacity expansion entitlements in accordance with sections 38\/39 GasNZV for storage facilities, production and LNG facilities and power plants. The aforementioned market participants are called upon to report their capacity reservations and capacity expansion claims by May 1, 2024. To this end, the TSOs have published criteria on the TSO Gas website that must also be met by May 1, 2024 in order to be included in the scenario framework.","twitter_image":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/09\/572C4E74-33E0-4101-9AC9-D7DC5518C57E_1_105_c-707x300.jpeg","twitter_site":"@FNB_Gas","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/fnb-gas.de\/en\/news\/tsos-request-capacity-reservations-and-capacity-expansion-entitlements-pursuant-to-sections-38-39-gasnzv-for-storage-production-and-lng-facilities-and-power-plants\/","url":"https:\/\/fnb-gas.de\/en\/news\/tsos-request-capacity-reservations-and-capacity-expansion-entitlements-pursuant-to-sections-38-39-gasnzv-for-storage-production-and-lng-facilities-and-power-plants\/","name":"TSOs request capacity reservations and capacity expansion entitlements pursuant to sections 38\/39 GasNZV for storage, production and LNG facilities and power plants - FNB Gas","isPartOf":{"@id":"https:\/\/fnb-gas.de\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/fnb-gas.de\/en\/news\/tsos-request-capacity-reservations-and-capacity-expansion-entitlements-pursuant-to-sections-38-39-gasnzv-for-storage-production-and-lng-facilities-and-power-plants\/#primaryimage"},"image":{"@id":"https:\/\/fnb-gas.de\/en\/news\/tsos-request-capacity-reservations-and-capacity-expansion-entitlements-pursuant-to-sections-38-39-gasnzv-for-storage-production-and-lng-facilities-and-power-plants\/#primaryimage"},"thumbnailUrl":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/08\/Erledigt_Liste-4539382_1920.jpg","datePublished":"2024-02-09T14:57:08+00:00","dateModified":"2024-02-12T08:55:07+00:00","description":"According to the federal government's draft legislation, the TSOs and the regulated operators of hydrogen transport networks must prepare the scenario framework for the first integrated gas and hydrogen network development plan by June 30, 2024. To determine the capacity requirements in the transmission system, the TSOs are now requesting capacity reservations and capacity expansion entitlements in accordance with sections 38\/39 GasNZV for storage facilities, production and LNG facilities and power plants. The aforementioned market participants are called upon to report their capacity reservations and capacity expansion claims by May 1, 2024. To this end, the TSOs have published criteria on the TSO Gas website that must also be met by May 1, 2024 in order to be included in the scenario framework.","breadcrumb":{"@id":"https:\/\/fnb-gas.de\/en\/news\/tsos-request-capacity-reservations-and-capacity-expansion-entitlements-pursuant-to-sections-38-39-gasnzv-for-storage-production-and-lng-facilities-and-power-plants\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/fnb-gas.de\/en\/news\/tsos-request-capacity-reservations-and-capacity-expansion-entitlements-pursuant-to-sections-38-39-gasnzv-for-storage-production-and-lng-facilities-and-power-plants\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/fnb-gas.de\/en\/news\/tsos-request-capacity-reservations-and-capacity-expansion-entitlements-pursuant-to-sections-38-39-gasnzv-for-storage-production-and-lng-facilities-and-power-plants\/#primaryimage","url":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/08\/Erledigt_Liste-4539382_1920.jpg","contentUrl":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2022\/08\/Erledigt_Liste-4539382_1920.jpg","width":1920,"height":815},{"@type":"BreadcrumbList","@id":"https:\/\/fnb-gas.de\/en\/news\/tsos-request-capacity-reservations-and-capacity-expansion-entitlements-pursuant-to-sections-38-39-gasnzv-for-storage-production-and-lng-facilities-and-power-plants\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/fnb-gas.de\/en\/"},{"@type":"ListItem","position":2,"name":"TSOs request capacity reservations and capacity expansion entitlements pursuant to sections 38\/39 GasNZV for storage, production and LNG facilities and power plants"}]},{"@type":"WebSite","@id":"https:\/\/fnb-gas.de\/en\/#website","url":"https:\/\/fnb-gas.de\/en\/","name":"FNB Gas","description":"","publisher":{"@id":"https:\/\/fnb-gas.de\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/fnb-gas.de\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/fnb-gas.de\/en\/#organization","name":"FNB Gas","url":"https:\/\/fnb-gas.de\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/fnb-gas.de\/en\/#\/schema\/logo\/image\/","url":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/FNB_Gas.png","contentUrl":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/FNB_Gas.png","width":1300,"height":630,"caption":"FNB Gas"},"image":{"@id":"https:\/\/fnb-gas.de\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/FNB_Gas","https:\/\/www.linkedin.com\/company\/73350372\/"]}]}},"_links":{"self":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news\/11955","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/types\/news"}],"version-history":[{"count":5,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news\/11955\/revisions"}],"predecessor-version":[{"id":11960,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news\/11955\/revisions\/11960"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/media\/8237"}],"wp:attachment":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/media?parent=11955"}],"wp:term":[{"taxonomy":"news_resort","embeddable":true,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news_resort?post=11955"},{"taxonomy":"news_types","embeddable":true,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news_types?post=11955"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}