{"id":11078,"date":"2023-11-14T16:10:25","date_gmt":"2023-11-14T15:10:25","guid":{"rendered":"https:\/\/fnb-gas.de\/news\/the-next-big-step-towards-the-hydrogen-core-network\/"},"modified":"2023-11-17T15:16:23","modified_gmt":"2023-11-17T14:16:23","slug":"the-next-big-step-towards-the-hydrogen-core-network","status":"publish","type":"news","link":"https:\/\/fnb-gas.de\/en\/news\/the-next-big-step-towards-the-hydrogen-core-network\/","title":{"rendered":"The next big step towards the hydrogen core network"},"content":{"rendered":"\n<p>FNB Gas e.V. today submitted the draft application for the hydrogen core network to the Federal Network Agency and the Federal Ministry for Economic Affairs and Climate Protection. &#8220;<em>This marks the next milestone in the realization of the core network<\/em>,&#8221; emphasizes Barbara Fischer, FNB Gas Managing Director.<\/p>\n\n<!--more-->\n\n<p>The transmission system operators (TSOs) have been working flat out on the final modeling and optimization over the past few weeks. The total length of the optimized core grid is around <strong>9,700 km <\/strong>. Of this, 710 km is accounted for by pipelines from 17 other potential hydrogen network operators, which the TSOs received as part of the opportunity to comment on the first planning status by 28.7.2023. The core network consists mainly of <strong>converted natural gas pipelines (approx. 60%)<\/strong>. The investment costs amount to <strong>\u20ac 19.8 billion \u20ac<\/strong>. The feed-in and feed-out capacities amount to <strong>around 100 GW and 87 GW respectively<\/strong>. <em> &#8220;The draft of the core network thus fulfills the<\/em> <em>goals of a Germany-wide, expandable, efficient and quickly realizable hydrogen network by the target year 2032, which are anchored<\/em><em> in the EnWG amendment to the hydrogen core network<\/em>.  <em>This puts Germany at the forefront of infrastructure development in Europe<\/em>,&#8221; continued Fischer.<\/p>\n\n<p>The submission of the draft application also marks the start of the first consultation of the draft core network by the Federal Network Agency on its <a href=\"https:\/\/www.bundesnetzagentur.de\/DE\/Fachthemen\/ElektrizitaetundGas\/Wasserstoff\/Kernnetz\/start.html\" target=\"_blank\" rel=\"noreferrer noopener\">website<\/a>. Once the amendment to the EnWG on the hydrogen core grid (Sections 28o &#8211; 28s) comes into force, the grid operators are expected to officially submit the final joint application in the first quarter of 2024, which will then be consulted on, reviewed and approved by the Federal Network Agency.<\/p>\n\n<p>The TSOs have the clear goal of starting to build the hydrogen core network next year. To this end, FNB will lobby its shareholders for the necessary investments. The legal establishment of a financing model suitable for the capital market is a prerequisite for the submission of the joint application by the TSOs and thus for the swift implementation of the core network. The draft bill passed by the cabinet today contains important elements for a viable financing concept: a capped, market-compatible ramp-up fee, the creation of an amortization account for interim financing of the revenue shortfall resulting from the cap and state protection in the event that the market ramp-up fails. Nevertheless, some questions remain unanswered or are to be settled by the Federal Network Agency. A conclusive assessment of capital market viability will only be possible once the interplay between statutory regulations, determinations by the Federal Network Agency and contractual regulations between the federal government and the core network operators is known.<\/p>\n\n<p><em>&#8220;The transformation from natural gas to green gases, above all hydrogen, is an opportunity of the century: for our society, our energy supply and, last but not least, the achievement of climate targets. The federal government and transmission system operators are now making an advance contribution to this with the hydrogen core network. The market ramp-up is a joint task.&#8221;<\/em>Dr. Thomas G\u00f6\u00dfmann, Chairman of the Board of FNB Gas, concludes.<\/p>\n\n<div class=\"container-fluid fnb-downloadl-block break-out\">\n    <div class=\"container\">\n\n        <div class=\"row\">\n            <div class=\"col-xs-12\">\n                <h4 class=\"rubrik text-center\">Downloads<\/h4>\n            <\/div>\n\n            <!-- Downloads -->\n            \n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Draft application H2 core network<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 995 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/11\/2023_11_15_Entwurf_Antrag_Wasserstoff-Kernnetz_final.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Draft application H2 core network Press release<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 615 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/11\/2023-11-15_FNB-Gas_Pressemitteilung_Veroeffentlichung-Antragsentwurf-H2-Kernnetz_final-3.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Draft application H2 core network map<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PNG \/ 1 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/11\/20231117_Entwurf_Kernnetzgruen.png\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Draft application H2 core network map with logo<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PNG \/ 2 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/11\/2023-11-14_Wasserstoff-Kernnetz_Karte-1.png\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Appendix 1 Project overview<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">Excel \/ 178 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/11\/2023_11_15_Anlage1_Projektuebersicht_Wasserstoff-Kernnetz_Veroeffentlichung_final.xlsx\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Appendix 2 List of measures for other H2 grid operators<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">Excel \/ 55 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/11\/2023_11_15_Anlage2_Leitungsmeldungen_weiterer_potenzieller_Wasserstoffnetzbetreiber_Veroeffentlichung_final.xlsx\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Appendix 3 List of measures FNB<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">Excel \/ 132 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/11\/2023_11_15_Anlage3_FNB_Massnahmenliste_Veroeffentlichung_final.xlsx\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>Appendix 4 Detailed map of measures<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 2 MB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/11\/2023_11_15_Anlage4_Detail-Massnahmenkarte.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                        <!-- \/Downloads -->\n\n        <\/div>\n\n    <\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>FNB Gas e.V. today submitted the draft application for the hydrogen core network to the Federal Network Agency and the Federal Ministry for Economic Affairs and Climate Protection. &#8220;This marks the next milestone in the realization of the core network,&#8221; emphasizes Barbara Fischer, FNB Gas Managing Director.<\/p>\n","protected":false},"featured_media":11009,"parent":0,"template":"","meta":{"_acf_changed":false,"footnotes":""},"news_resort":[68],"news_types":[102],"class_list":["post-11078","news","type-news","status-publish","has-post-thumbnail","hentry","news_resort-hydrogen-network","news_types-news-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The next big step towards the hydrogen core network - FNB Gas<\/title>\n<meta name=\"description\" content=\"FNB Gas e.V. today submitted the draft application for the hydrogen core network to the Federal Network Agency and the Federal Ministry for Economic Affairs and Climate Protection. &quot;This marks the next milestone in the realization of the core network,&quot; emphasizes Barbara Fischer, FNB Gas Managing Director.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/fnb-gas.de\/en\/news\/the-next-big-step-towards-the-hydrogen-core-network\/\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"The next big step towards the hydrogen core network\" \/>\n<meta name=\"twitter:description\" content=\"FNB Gas e.V. today submitted the draft application for the hydrogen core network to the Federal Network Agency and the Federal Ministry for Economic Affairs and Climate Protection. &quot;This marks the next milestone in the realization of the core network,&quot; emphasizes Barbara Fischer, FNB Gas Managing Director.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/11\/Foto-Habeck-Goessmann-Pressekonferenz-1110x738.png\" \/>\n<meta name=\"twitter:site\" content=\"@FNB_Gas\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/the-next-big-step-towards-the-hydrogen-core-network\\\/\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/the-next-big-step-towards-the-hydrogen-core-network\\\/\",\"name\":\"The next big step towards the hydrogen core network - FNB Gas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/the-next-big-step-towards-the-hydrogen-core-network\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/the-next-big-step-towards-the-hydrogen-core-network\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Foto-Habeck-Goessmann-Pressekonferenz-1.png\",\"datePublished\":\"2023-11-14T15:10:25+00:00\",\"dateModified\":\"2023-11-17T14:16:23+00:00\",\"description\":\"FNB Gas e.V. today submitted the draft application for the hydrogen core network to the Federal Network Agency and the Federal Ministry for Economic Affairs and Climate Protection. \\\"This marks the next milestone in the realization of the core network,\\\" emphasizes Barbara Fischer, FNB Gas Managing Director.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/the-next-big-step-towards-the-hydrogen-core-network\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/the-next-big-step-towards-the-hydrogen-core-network\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/the-next-big-step-towards-the-hydrogen-core-network\\\/#primaryimage\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Foto-Habeck-Goessmann-Pressekonferenz-1.png\",\"contentUrl\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Foto-Habeck-Goessmann-Pressekonferenz-1.png\",\"width\":1280,\"height\":571,\"caption\":\"Copyright: (C) BMWK \\\/ Susanne Eriksson\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/the-next-big-step-towards-the-hydrogen-core-network\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The next big step towards the hydrogen core network\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/\",\"name\":\"FNB Gas\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#organization\",\"name\":\"FNB Gas\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/FNB_Gas.png\",\"contentUrl\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/FNB_Gas.png\",\"width\":1300,\"height\":630,\"caption\":\"FNB Gas\"},\"image\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/FNB_Gas\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/73350372\\\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The next big step towards the hydrogen core network - FNB Gas","description":"FNB Gas e.V. today submitted the draft application for the hydrogen core network to the Federal Network Agency and the Federal Ministry for Economic Affairs and Climate Protection. \"This marks the next milestone in the realization of the core network,\" emphasizes Barbara Fischer, FNB Gas Managing Director.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/fnb-gas.de\/en\/news\/the-next-big-step-towards-the-hydrogen-core-network\/","twitter_card":"summary_large_image","twitter_title":"The next big step towards the hydrogen core network","twitter_description":"FNB Gas e.V. today submitted the draft application for the hydrogen core network to the Federal Network Agency and the Federal Ministry for Economic Affairs and Climate Protection. \"This marks the next milestone in the realization of the core network,\" emphasizes Barbara Fischer, FNB Gas Managing Director.","twitter_image":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/11\/Foto-Habeck-Goessmann-Pressekonferenz-1110x738.png","twitter_site":"@FNB_Gas","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/fnb-gas.de\/en\/news\/the-next-big-step-towards-the-hydrogen-core-network\/","url":"https:\/\/fnb-gas.de\/en\/news\/the-next-big-step-towards-the-hydrogen-core-network\/","name":"The next big step towards the hydrogen core network - FNB Gas","isPartOf":{"@id":"https:\/\/fnb-gas.de\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/fnb-gas.de\/en\/news\/the-next-big-step-towards-the-hydrogen-core-network\/#primaryimage"},"image":{"@id":"https:\/\/fnb-gas.de\/en\/news\/the-next-big-step-towards-the-hydrogen-core-network\/#primaryimage"},"thumbnailUrl":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/11\/Foto-Habeck-Goessmann-Pressekonferenz-1.png","datePublished":"2023-11-14T15:10:25+00:00","dateModified":"2023-11-17T14:16:23+00:00","description":"FNB Gas e.V. today submitted the draft application for the hydrogen core network to the Federal Network Agency and the Federal Ministry for Economic Affairs and Climate Protection. \"This marks the next milestone in the realization of the core network,\" emphasizes Barbara Fischer, FNB Gas Managing Director.","breadcrumb":{"@id":"https:\/\/fnb-gas.de\/en\/news\/the-next-big-step-towards-the-hydrogen-core-network\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/fnb-gas.de\/en\/news\/the-next-big-step-towards-the-hydrogen-core-network\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/fnb-gas.de\/en\/news\/the-next-big-step-towards-the-hydrogen-core-network\/#primaryimage","url":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/11\/Foto-Habeck-Goessmann-Pressekonferenz-1.png","contentUrl":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/11\/Foto-Habeck-Goessmann-Pressekonferenz-1.png","width":1280,"height":571,"caption":"Copyright: (C) BMWK \/ Susanne Eriksson"},{"@type":"BreadcrumbList","@id":"https:\/\/fnb-gas.de\/en\/news\/the-next-big-step-towards-the-hydrogen-core-network\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/fnb-gas.de\/en\/"},{"@type":"ListItem","position":2,"name":"The next big step towards the hydrogen core network"}]},{"@type":"WebSite","@id":"https:\/\/fnb-gas.de\/en\/#website","url":"https:\/\/fnb-gas.de\/en\/","name":"FNB Gas","description":"","publisher":{"@id":"https:\/\/fnb-gas.de\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/fnb-gas.de\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/fnb-gas.de\/en\/#organization","name":"FNB Gas","url":"https:\/\/fnb-gas.de\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/fnb-gas.de\/en\/#\/schema\/logo\/image\/","url":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/FNB_Gas.png","contentUrl":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/FNB_Gas.png","width":1300,"height":630,"caption":"FNB Gas"},"image":{"@id":"https:\/\/fnb-gas.de\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/FNB_Gas","https:\/\/www.linkedin.com\/company\/73350372\/"]}]}},"_links":{"self":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news\/11078","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/types\/news"}],"version-history":[{"count":5,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news\/11078\/revisions"}],"predecessor-version":[{"id":11130,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news\/11078\/revisions\/11130"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/media\/11009"}],"wp:attachment":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/media?parent=11078"}],"wp:term":[{"taxonomy":"news_resort","embeddable":true,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news_resort?post=11078"},{"taxonomy":"news_types","embeddable":true,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news_types?post=11078"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}