{"id":10526,"date":"2023-08-14T14:49:25","date_gmt":"2023-08-14T12:49:25","guid":{"rendered":"https:\/\/fnb-gas.de\/news\/comments-on-the-draft-bill-to-extend-the-provisions-of-part-3a-and-to-amend-section-49b-1-sentence-1-of-the-energy-industry-act-enwg\/"},"modified":"2023-08-14T16:01:52","modified_gmt":"2023-08-14T14:01:52","slug":"comments-on-the-draft-bill-to-extend-the-provisions-of-part-3a-and-to-amend-section-49b-1-sentence-1-of-the-energy-industry-act-enwg","status":"publish","type":"news","link":"https:\/\/fnb-gas.de\/en\/news\/comments-on-the-draft-bill-to-extend-the-provisions-of-part-3a-and-to-amend-section-49b-1-sentence-1-of-the-energy-industry-act-enwg\/","title":{"rendered":"Comments on the draft bill to extend the provisions of Part 3a and to amend Section 49b (1) sentence 1 of the Energy Industry Act (EnWG)"},"content":{"rendered":"\n<p>The regulations of Part 3a of the EnWG with the requirements on gas storage levels are to be extended until April 2027. This is based in particular on the fact that the onshore LNG terminals are expected to come on stream in mid-2027, from which point a further easing of the supply situation can be expected. The transmission system operators expressly support this approach. It has been shown that the legal regulations are suitable for the safe filling of gas storage facilities in Germany.<\/p>\n\n<p>The intended amendment to Section 49b (1) Sentence 1 of the German Energy Industry Act (EnWG), which is intended to allow an extension of the temporary higher utilization of the electricity grid until the end of March 2027, is to be expressly welcomed as a measure that makes sense in terms of energy and the economy. Nevertheless, the temporary increase in capacity utilization associated with an acquiescence obligation represents a considerable expense for the TSO, which is not adequately taken into account by law. In the absence of concrete legal regulations, the contractual arrangements between the transmission system operator and the TSO are still subject to various uncertainties (e.g., the extent of the obligation to bear costs). In addition, the short-term approval of the necessary protection and safeguard measures also represents an additional burden for the TSO in the absence of legally manifested acceleration regulations. Therefore, the consequences for the affected operators of technical infrastructures must be given greater focus. The TSOs made concrete proposals for this in the course of the hearing with the associations.<\/p>\n\n<p>The complete statement of the FNB Gas is available in the downloads.<\/p>\n\n<!--more-->\n\n<div class=\"container-fluid fnb-downloadl-block break-out\">\n    <div class=\"container\">\n\n        <div class=\"row\">\n            <div class=\"col-xs-12\">\n                <h4 class=\"rubrik text-center\">Downloads<\/h4>\n            <\/div>\n\n            <!-- Downloads -->\n            \n                                    \n                    <div class=\"col-xs-12 col-lg-10 col-xl-8 g-2 offset-lg-1 offset-xl-2 fnb-downloadl-item\">\n                        <div class=\"fnb-dl-name\"><b>FNB Gas STN extension Paragraph 49b and Part 3a<\/b><\/div>\n                        <div class=\"fnb-meta-wrap\">\n                            <div class=\"fnb-dl-beschriftung\">PDF \/ 278 kB<\/div>\n                            <div class=\"fnb-dl-button nep-dl-button\"><a\n                                        target=\"_blank\"\n                                        href=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/08\/FNB-Gas-Stellungnahme-Verlaengerung-Paragraph-49b-und-Teil-3a.pdf\"> <\/a><\/div>\n                        <\/div>\n                        <div class=\"fnb-dl-trenner\"><span><\/span><\/div>\n                    <\/div>\n\n\n                                        <!-- \/Downloads -->\n\n        <\/div>\n\n    <\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>The regulations of Part 3a of the EnWG with the requirements on gas storage levels are to be extended until April 2027. This is based in particular on the fact that the onshore LNG terminals are expected to come on stream in mid-2027, from which point a further easing of the supply situation can be [&hellip;]<\/p>\n","protected":false},"featured_media":10516,"parent":0,"template":"","meta":{"_acf_changed":false,"footnotes":""},"news_resort":[65,67],"news_types":[73],"class_list":["post-10526","news","type-news","status-publish","has-post-thumbnail","hentry","news_resort-energy-future","news_resort-security-of-supply","news_types-position-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Comments on the draft bill to extend the provisions of Part 3a and to amend Section 49b (1) sentence 1 of the Energy Industry Act (EnWG) - FNB Gas<\/title>\n<meta name=\"description\" content=\"The regulations of Part 3a of the EnWG with the requirements on gas storage levels are to be extended until April 2027. This is based in particular on the fact that the onshore LNG terminals are expected to come on stream in mid-2027, from which point a further easing of the supply situation can be expected. The transmission system operators expressly support this approach. It has been shown that the legal regulations are suitable for the safe filling of gas storage facilities in Germany.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/fnb-gas.de\/en\/news\/comments-on-the-draft-bill-to-extend-the-provisions-of-part-3a-and-to-amend-section-49b-1-sentence-1-of-the-energy-industry-act-enwg\/\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Statement of the FNB Gas on the draft bill to extend the provisions of Part 3a and to amend Section 49b (1) Sentence 1 EnWG\" \/>\n<meta name=\"twitter:description\" content=\"The regulations of Part 3a of the EnWG with the requirements on gas storage levels are to be extended until April 2027. This is based in particular on the fact that the onshore LNG terminals are expected to come on stream in mid-2027, from which point a further easing of the supply situation can be expected. The transmission system operators expressly support this approach. It has been shown that the legal regulations are suitable for the safe filling of gas storage facilities in Germany.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/08\/iStock-1215883716-707x300.jpg\" \/>\n<meta name=\"twitter:site\" content=\"@FNB_Gas\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/comments-on-the-draft-bill-to-extend-the-provisions-of-part-3a-and-to-amend-section-49b-1-sentence-1-of-the-energy-industry-act-enwg\\\/\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/comments-on-the-draft-bill-to-extend-the-provisions-of-part-3a-and-to-amend-section-49b-1-sentence-1-of-the-energy-industry-act-enwg\\\/\",\"name\":\"Comments on the draft bill to extend the provisions of Part 3a and to amend Section 49b (1) sentence 1 of the Energy Industry Act (EnWG) - FNB Gas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/comments-on-the-draft-bill-to-extend-the-provisions-of-part-3a-and-to-amend-section-49b-1-sentence-1-of-the-energy-industry-act-enwg\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/comments-on-the-draft-bill-to-extend-the-provisions-of-part-3a-and-to-amend-section-49b-1-sentence-1-of-the-energy-industry-act-enwg\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/iStock-1215883716.jpg\",\"datePublished\":\"2023-08-14T12:49:25+00:00\",\"dateModified\":\"2023-08-14T14:01:52+00:00\",\"description\":\"The regulations of Part 3a of the EnWG with the requirements on gas storage levels are to be extended until April 2027. This is based in particular on the fact that the onshore LNG terminals are expected to come on stream in mid-2027, from which point a further easing of the supply situation can be expected. The transmission system operators expressly support this approach. It has been shown that the legal regulations are suitable for the safe filling of gas storage facilities in Germany.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/comments-on-the-draft-bill-to-extend-the-provisions-of-part-3a-and-to-amend-section-49b-1-sentence-1-of-the-energy-industry-act-enwg\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/comments-on-the-draft-bill-to-extend-the-provisions-of-part-3a-and-to-amend-section-49b-1-sentence-1-of-the-energy-industry-act-enwg\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/comments-on-the-draft-bill-to-extend-the-provisions-of-part-3a-and-to-amend-section-49b-1-sentence-1-of-the-energy-industry-act-enwg\\\/#primaryimage\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/iStock-1215883716.jpg\",\"contentUrl\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/iStock-1215883716.jpg\",\"width\":1254,\"height\":532,\"caption\":\"Law scale rules regulations\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/news\\\/comments-on-the-draft-bill-to-extend-the-provisions-of-part-3a-and-to-amend-section-49b-1-sentence-1-of-the-energy-industry-act-enwg\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Comments on the draft bill to extend the provisions of Part 3a and to amend Section 49b (1) sentence 1 of the Energy Industry Act (EnWG)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/\",\"name\":\"FNB Gas\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#organization\",\"name\":\"FNB Gas\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/FNB_Gas.png\",\"contentUrl\":\"https:\\\/\\\/fnb-gas.de\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/FNB_Gas.png\",\"width\":1300,\"height\":630,\"caption\":\"FNB Gas\"},\"image\":{\"@id\":\"https:\\\/\\\/fnb-gas.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/x.com\\\/FNB_Gas\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/73350372\\\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Comments on the draft bill to extend the provisions of Part 3a and to amend Section 49b (1) sentence 1 of the Energy Industry Act (EnWG) - FNB Gas","description":"The regulations of Part 3a of the EnWG with the requirements on gas storage levels are to be extended until April 2027. This is based in particular on the fact that the onshore LNG terminals are expected to come on stream in mid-2027, from which point a further easing of the supply situation can be expected. The transmission system operators expressly support this approach. It has been shown that the legal regulations are suitable for the safe filling of gas storage facilities in Germany.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/fnb-gas.de\/en\/news\/comments-on-the-draft-bill-to-extend-the-provisions-of-part-3a-and-to-amend-section-49b-1-sentence-1-of-the-energy-industry-act-enwg\/","twitter_card":"summary_large_image","twitter_title":"Statement of the FNB Gas on the draft bill to extend the provisions of Part 3a and to amend Section 49b (1) Sentence 1 EnWG","twitter_description":"The regulations of Part 3a of the EnWG with the requirements on gas storage levels are to be extended until April 2027. This is based in particular on the fact that the onshore LNG terminals are expected to come on stream in mid-2027, from which point a further easing of the supply situation can be expected. The transmission system operators expressly support this approach. It has been shown that the legal regulations are suitable for the safe filling of gas storage facilities in Germany.","twitter_image":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/08\/iStock-1215883716-707x300.jpg","twitter_site":"@FNB_Gas","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/fnb-gas.de\/en\/news\/comments-on-the-draft-bill-to-extend-the-provisions-of-part-3a-and-to-amend-section-49b-1-sentence-1-of-the-energy-industry-act-enwg\/","url":"https:\/\/fnb-gas.de\/en\/news\/comments-on-the-draft-bill-to-extend-the-provisions-of-part-3a-and-to-amend-section-49b-1-sentence-1-of-the-energy-industry-act-enwg\/","name":"Comments on the draft bill to extend the provisions of Part 3a and to amend Section 49b (1) sentence 1 of the Energy Industry Act (EnWG) - FNB Gas","isPartOf":{"@id":"https:\/\/fnb-gas.de\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/fnb-gas.de\/en\/news\/comments-on-the-draft-bill-to-extend-the-provisions-of-part-3a-and-to-amend-section-49b-1-sentence-1-of-the-energy-industry-act-enwg\/#primaryimage"},"image":{"@id":"https:\/\/fnb-gas.de\/en\/news\/comments-on-the-draft-bill-to-extend-the-provisions-of-part-3a-and-to-amend-section-49b-1-sentence-1-of-the-energy-industry-act-enwg\/#primaryimage"},"thumbnailUrl":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/08\/iStock-1215883716.jpg","datePublished":"2023-08-14T12:49:25+00:00","dateModified":"2023-08-14T14:01:52+00:00","description":"The regulations of Part 3a of the EnWG with the requirements on gas storage levels are to be extended until April 2027. This is based in particular on the fact that the onshore LNG terminals are expected to come on stream in mid-2027, from which point a further easing of the supply situation can be expected. The transmission system operators expressly support this approach. It has been shown that the legal regulations are suitable for the safe filling of gas storage facilities in Germany.","breadcrumb":{"@id":"https:\/\/fnb-gas.de\/en\/news\/comments-on-the-draft-bill-to-extend-the-provisions-of-part-3a-and-to-amend-section-49b-1-sentence-1-of-the-energy-industry-act-enwg\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/fnb-gas.de\/en\/news\/comments-on-the-draft-bill-to-extend-the-provisions-of-part-3a-and-to-amend-section-49b-1-sentence-1-of-the-energy-industry-act-enwg\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/fnb-gas.de\/en\/news\/comments-on-the-draft-bill-to-extend-the-provisions-of-part-3a-and-to-amend-section-49b-1-sentence-1-of-the-energy-industry-act-enwg\/#primaryimage","url":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/08\/iStock-1215883716.jpg","contentUrl":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2023\/08\/iStock-1215883716.jpg","width":1254,"height":532,"caption":"Law scale rules regulations"},{"@type":"BreadcrumbList","@id":"https:\/\/fnb-gas.de\/en\/news\/comments-on-the-draft-bill-to-extend-the-provisions-of-part-3a-and-to-amend-section-49b-1-sentence-1-of-the-energy-industry-act-enwg\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/fnb-gas.de\/en\/"},{"@type":"ListItem","position":2,"name":"Comments on the draft bill to extend the provisions of Part 3a and to amend Section 49b (1) sentence 1 of the Energy Industry Act (EnWG)"}]},{"@type":"WebSite","@id":"https:\/\/fnb-gas.de\/en\/#website","url":"https:\/\/fnb-gas.de\/en\/","name":"FNB Gas","description":"","publisher":{"@id":"https:\/\/fnb-gas.de\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/fnb-gas.de\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/fnb-gas.de\/en\/#organization","name":"FNB Gas","url":"https:\/\/fnb-gas.de\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/fnb-gas.de\/en\/#\/schema\/logo\/image\/","url":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/FNB_Gas.png","contentUrl":"https:\/\/fnb-gas.de\/wp-content\/uploads\/2021\/11\/FNB_Gas.png","width":1300,"height":630,"caption":"FNB Gas"},"image":{"@id":"https:\/\/fnb-gas.de\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/FNB_Gas","https:\/\/www.linkedin.com\/company\/73350372\/"]}]}},"_links":{"self":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news\/10526","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/types\/news"}],"version-history":[{"count":1,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news\/10526\/revisions"}],"predecessor-version":[{"id":10527,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news\/10526\/revisions\/10527"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/media\/10516"}],"wp:attachment":[{"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/media?parent=10526"}],"wp:term":[{"taxonomy":"news_resort","embeddable":true,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news_resort?post=10526"},{"taxonomy":"news_types","embeddable":true,"href":"https:\/\/fnb-gas.de\/en\/wp-json\/wp\/v2\/news_types?post=10526"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}