Pipeline construction in the Ore Mountains
The EUGAL is to run from Lubmin near Greifswald on the Baltic Sea in Mecklenburg-Western Pomerania in a southerly direction to Deutschneudorf in Saxony and on to the Czech Republic. It has a total length of around 480 kilometers and is to be laid in large sections parallel to the Baltic Sea Pipeline Link (OPAL). Thus, it runs through three federal states. The uneven terrain in the Ore Mountains made it necessary to use special technology when laying the pipelines.
NOTES ON USE
Unless otherwise stated, the rights to the images, texts, audio and video files published on this page are held by FNB Gas e.V. The files from the press material section may be used for editorial reporting provided the source is acknowledged. The use or reprinting is free of charge. Please provide us with a copy in the event of any use. Any other use is only permitted with the prior written consent of FNB Gas e.V.
The files provided have been created to the best of our knowledge and belief. Notwithstanding this, FNB Gas e.V. accepts no responsibility for any damage arising from the use of the files.
Download
Print file (high resolution): Pipeline construction in the Ore Mountains / 3.02MB / JPG / 36,3 x 24,1 cm / 4288 x 2848 px / 300 dpi / RGB
Rights HolderOntras Gastransport Ltd.