Press material

Journalists who would like to find out more about FNB Gas, key topics and the background to the association will find selected graphics, photos and films here for downloading and free use. In case of editorial use, we would appreciate a reference to FNB Gas e.V.

Grid expansion measures Hydrogen variant 2027

The hydrogen network 2027 presented in the interim status for the NEP Gas 2022-2032 shows the result of the modeling of a Germany-wide hydrogen network for the year 2027 based on the MoU requirements, the results of the network development plan Gas 2020-2030 and the pipeline reports of the transmission system operators and other potential hydrogen network operators as well as on existing parallel pipeline systems in the transmission system. This will result in a hydrogen network with a pipeline length of 2,900-3,000 km by 2027.

NOTES ON USE
Unless otherwise stated, the rights to the images, texts, audio and video files published on this page are held by FNB Gas e.V. The files from the press material section may be used for editorial reporting provided the source is acknowledged. The use or reprinting is free of charge. Please provide us with a copy in the event of any use. Any other use is only permitted with the prior written consent of FNB Gas e.V.

The files provided have been created to the best of our knowledge and belief. Notwithstanding this, FNB Gas e.V. accepts no responsibility for any damage arising from the use of the files.

Download

Infographic - Grid expansion measures hydrogen variant 2027 / JPG / 236 kB

Rights Holder

Transmission system operators and other potential H2 system operators.