Draft of the 2027 hydrogen core network
The hydrogen core network will be built up successively until 2032, starting with the first pipeline conversion in 2025. The diagram shows the planned commissioning of the expansion stage of the core network in 2027.
NOTES ON USE
Unless otherwise stated, the rights to the images, texts, audio and video files published on this page are held by FNB Gas e.V. The files from the press material section may be used for editorial reporting provided the source is acknowledged. The use or reprinting is free of charge. Please provide us with a copy in the event of any use. Any other use is only permitted with the prior written consent of FNB Gas e.V.
The files provided have been created to the best of our knowledge and belief. Notwithstanding this, FNB Gas e.V. accepts no responsibility for any damage arising from the use of the files.
Download
Infographic - Draft of the hydrogen core network 2027 / PNG / 2 MB
Rights HolderFNB Gas e.V.