Design for the hydrogen core network (with logo)
In recent weeks, the transmission system operators (TSOs) have been working flat out on the final modeling of the hydrogen core network and its optimization. The total length of the optimized core network is around 9,700 km. Of this, 710 km is accounted for by pipelines from 17 other potential hydrogen network operators, which the TSOs received as part of the opportunity to comment on the first planning status by 28.7.2023. The core network consists mainly of converted natural gas pipelines (approx. 60%). The investment costs amount to €19.8 billion. The feed-in and feed-out capacities amount to around 100 GW and 87 GW respectively.
NOTES ON USE
Unless otherwise stated, the rights to the images, texts, audio and video files published on this page are held by FNB Gas e.V. The files from the press material section may be used for editorial reporting provided the source is acknowledged. The use or reprinting is free of charge. Please provide us with a copy in the event of any use. Any other use is only permitted with the prior written consent of FNB Gas e.V.
The files provided have been created to the best of our knowledge and belief. Notwithstanding this, FNB Gas e.V. accepts no responsibility for any damage arising from the use of the files.
Download
Infographic - Draft for the hydrogen core network (with logo) / PNG / 2 MB
Rights HolderFNB Gas e.V.