Network development plan 2014

28.01.2015 | Confirmation

Transmission system operators publish Gas Network Development Plan 2014

The demand-oriented expansion of the national natural gas infrastructure is a focus of the Gas Network Development Plan 2014 (Gas NDP 2014), which the German transmission system operators (TSOs) presented today. This provides for expansion measures with an investment volume of around 2.8 billion euros up to 2024. The 51 specific measures were confirmed by the Federal Network Agency (BNetzA) following consultations with market participants such as gas traders, power plant and storage operators. This will increase compressor capacity in Germany by a total of 343 megawatts. Added to this is the construction of a further 748 kilometers of high-pressure natural gas pipelines.

A key challenge in the coming years is the significant decline in domestic production of L-gas in conjunction with the likewise declining L-gas import volumes from the Netherlands. In the Gas NDP 2014, which is now available, the TSOs are developing an infrastructure for H-gas volumes to replace the declining L-gas volumes. In addition, the Gas NDP 2014 contains a detailed roadmap for the conversion of market areas currently still supplied with L-gas to H-gas. “The third Germany-wide gas network development plan published today sets an important milestone for maintaining security of supply,” emphasized Inga Posch, Managing Director of the Association of Gas Transmission System Operators (FNB Gas). “Thus, the Gas NDP 2014 represents an important document for the long-term security of gas supply in Germany and Europe in times of the energy transition.”

Downloads
Annex to the Network Development Plan Gas 2014: Input lists
XLSX / 0.46MB
Annex to the Network Development Plan Gas 2014: Interruption List
XLS / 0.23MB
Annex to the Gas Network Development Plan 2014: L-gas conversion areas
XLSX / 0.07MB
Annex to the Gas Network Development Plan 2014: List of measures + network expansion proposal
XLS / 0.18MB
Annex to the Gas Network Development Plan 2014: Overview of Measures
XLS / 0.06MB
Annex to the Gas Network Development Plan 2014: Project profiles
PDF / 14.31MB
17.11.2014 | Revision

Federal Network Agency addresses change requests to transmission system operators

Today, the Federal Network Agency sent a request for amendments to the 2014 Gas Network Development Plan to the transmission system operators.

Downloads
Consultation results on the Gas Network Development Plan 2014
PDF / 0.38MB
BNetzA’s request for amendments to the Gas Network Development Plan 2014
PDF / 0.36MB
01.04.2014 | Draft

The German transmission system operators submit the draft gas network development plan 2014 to the BNetzA

For the third year in a row, the German transmission system operators (TSOs) are today submitting the Gas Network Development Plan (Gas NDP) to the Federal Network Agency (BNetzA). The draft Gas NDP 2014 contains more than 50 measures for the expansion of the national gas infrastructure in the next ten years and is based on the scenario framework confirmed by the BNetzA in October 2013. The investments resulting from the planned expansion will total around EUR 1.8 billion by 2019 and rise to a total of EUR 3.1 billion by 2024.

One focus of the Gas NDP 2014 is the successive conversion of L-gas-supplied areas to H-gas. This focus will be necessary in view of the decreasing production of L-gas in Germany and the decreasing L-gas exports from the Netherlands from 2020. “With the concrete activities for the practical implementation of the switchover, the topic of security of supply remains at the top of the agenda for German transmission system operators in the new NDP,” said Inga Posch, Managing Director of the Association of Transmission System Operators for Gas e.V. (FNB Gas). Major expansion measures are planned, particularly in southeastern and northwestern Germany (see map). Concrete descriptions of all projects can be found in the published project profiles, which represent an important innovation of the NDP 2014. The BNetzA is now consulting all market participants again and will then publish the result. Any additions and changes will then be incorporated into the NDP 2014 by the TSOs.

Downloads
Draft network development plan 2014
PDF / 6MB
Annex to the Gas Network Development Plan 2014: Input List Modeling
XLSX / 0.47MB
Annex to the Network Development Plan Gas 2014: Interruption List
XLS / 0.23MB
Annex to the Gas Network Development Plan 2014: L-gas switchover areas
XLSX / 0.07MB
Annex to the Gas Network Development Plan 2014: List of measures | Network expansion proposal
XLS / 0.16MB
Annex to the Gas Network Development Plan 2014: Overview of measures
XLS / 0.06MB
Annex to the Gas Network Development Plan 2014: Project profiles
PDF / 10.93MB
Annex to the Gas Network Development Plan 2014: Project profiles
PDF / 10.93MB
Comments on the Gas Network Development Plan 2014
ZIP / 11.38MB
PDF Press Release: Draft Gas Network Development Plan 2014 of 01.04.2014
PDF / 0.59MB
Press Release: 2014 Network Development Plan (NDP) for gas emphasizes market conversion from low cv gas to high cv gas
PDF / 0.6MB
Executive Summary: draft network development plan 2014 (NDP)
PDF / 0.15MB
25.02.2014 | Workshop

On 24.02. The workshop on the draft of the network development plan for gas 2014 took place

On the occasion of the consultation on the draft NDP 2014, the TSOs had invited to a workshop in which representatives of all value creation levels participated. In addition to technical presentations by the TSOs, the Federal Network Agency gave a presentation on its initial assessments of the NEP consultation document.

Downloads
Workshop on the consultation of the Gas Network Development Plan 2014: Agenda
PDF / 0.09MB
Workshop for the consultation of the network development plan gas 2014: First assessment and schedule BNetzA
PDF / 1.52MB
Workshop on the Gas Network Development Plan 2014: Source Distribution H-Gas
PDF / 1.55MB
Workshop on the 2014 Network Development Plan: Security of Supply Scenario “L-Gas Performance Balance 2030
PDF / 1.35MB
Workshop on the consultation of the 2014 network development plan: modeling results
PDF / 1.05MB
2014 Network Development Plan Workshop: Network Expansion Measures
PDF / 0.7MB
17.02.2014 | Draft

Transmission system operators publish draft of third Germany-wide network development plan for gas 2014

With the publication of the third Germany-wide Gas Network Development Plan (NEP 2014), the German transmission system operators (TSOs) today give the starting signal for the subsequent consultation procedure on the draft NEP.

Market participants have until March 7, 2014 to submit their comments on the published consultation document.

If a statement or individual passages of the statement are not to be submitted to the Federal Network Agency and the contents of the statement are not to be published, the consultation participant must indicate this accordingly.

Downloads
Consultation document Network Development Plan Gas 2014
PDF / 7.8MB
Annex to the Network Development Plan Gas 2014: Input lists
XLSX / 0.46MB
Annex to the Network Development Plan Gas 2014: Interruption List
XLS / 0.23MB
Annex to the Gas Network Development Plan 2014: L-gas switchover areas
XLSX / 0.07MB
Annex to the Gas Network Development Plan 2014: List of measures | Network expansion proposal
XLS / 0.16MB
Annex to the Gas Network Development Plan 2014: Overview of measures
XLS / 0.07MB
Annex to the Gas Network Development Plan 2014: Project profiles
PDF / 8.04MB
PDF Press release: Consultation on the Gas Network Development Plan 2014 of 17.02.2014
PDF / 0.33MB
Press Release: German gas TSOs start consultation of 2014 Network Development Plan
PDF / 0.34MB
Executive Summary: draft network development plan 2014 (NDP) 17.02.2014
PDF / 0.16MB
23.01.2014 | Consultation

Invitation to the accompanying workshop on the occasion of the consultation of the Gas Network Development Plan 2014

The German transmission system operators plan to publish the consultation document for the Gas NDP 2014 on February 17, 2014. The basis for the preparation of the Gas NDP 2014 is the scenario framework confirmed by the Federal Network Agency, which was prepared by Prognos AG on behalf of the TSOs.

The accompanying workshop is intended to continue the dialog with market participants and give them the opportunity to ask questions and make suggestions about the network development plan.

The workshop will take place on February 24, 2014, from 10:30 a.m. to 4 p.m. at Hotel NH Berlin, Friedrichstraße 96, 10117 Berlin.

Downloads
Invitation to the accompanying workshop on the occasion of the consultation of the Gas Network Development Plan 2014
PDF / 0.37 MB
Invitation – consultation workshop on the Gas Network Development Plan 2014
PDF / 0.37 MB

Overview

Status in the project cycle